HYDROGEOLOGY OF TOMPASO GEOTHERMAL SYSTEM AND THE IMPLICATION TO 3D CONCEPTUAL MODEL
The Tompaso geothermal field is in the administrative district of Minahasa, North Sulawesi province. The commercial operation started in December 2016 through units 5 and 6 Power Plant Lahendong area with 2x20 MWe capacity. Geothermal fluid moves from southwest to northeast controlled by Soputan...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/66939 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |