TIDAL TURBINE CONFIGURATION ANALYSIS AT LARANTUKA STRAIT, EAST NUSA TENGGARA, INDONESIA
Continuous use of fossil fuels has proven to have a significant impact on the climate. Indonesia has declared its commitment in achieving net-zero emissions by 2060 as an effort to reduce the effects of climate change. One of the strategies implemented is the transition to new and renewable energ...
Saved in:
Main Author: | Seravina, Audrey |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/66981 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
FINANCIAL FEASIBILITY STUDY OF TIDAL TURBINE PROJECT AT LARANTUKA STRAIT, EAST NUSA TENGGARA
by: Harrison Hasiando M., Genta -
DESIGN AND ANALYSIS OF A MONOPILE-TYPE TIDAL TURBINE SUPPORT STRUCTURE IN LARANTUKA STRAIT, EAST NUSA TENGGARA
by: Rifqi Ramadhan, Aryo -
ENERGY STORAGE SYSTEM PLANNING FOR TIDAL STREAM ENERGY IN LARANTUKA STRAIT, EAST NUSA TENGGARA
by: Naufal, Irfan -
DESIGN OF MOORING SYSTEM ON FLOATING TIDAL CURRENT TURBINE AS THE BASIS FOR DEVELOPMENT OF TURBINE FARM IN LARANTUKA STRAIT
by: Duanita Hermilia - NIM: 15514005, Rizky -
PLANNING OF TIDAL CURRENT POWER PLANT IN ALAS STRAIT, WEST NUSA TENGGARA PROVINCE
by: Aulia Alfatihah, Ainunnisa