RETENTION POND DESIGN TO REDUCE FLOOD LEVEL IN WAY BATU MERAH BASIN AMBON
Ambon City is a city located in Maluku Province and is a central of government and a central of development. Way Batu Merah River which flows in the middle of Ambon City becomes one of the main reason of the flood disaster that happens every year and causes many harms in materil dan non-materil a...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/67289 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:67289 |
---|---|
spelling |
id-itb.:672892022-08-19T10:42:18ZRETENTION POND DESIGN TO REDUCE FLOOD LEVEL IN WAY BATU MERAH BASIN AMBON Magdalena Simangunsong, Diana Indonesia Final Project Flood, Retention Pond, Way Batu Merah River, HecRAS 6.1 INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/67289 Ambon City is a city located in Maluku Province and is a central of government and a central of development. Way Batu Merah River which flows in the middle of Ambon City becomes one of the main reason of the flood disaster that happens every year and causes many harms in materil dan non-materil aspects. This research is meant to design the structure that can be contributed to reduce flood level in Way Batu Merah Basin. Structure that is designed include retention pond. Based on hydrological and hydraulics analysis with HECRAS 6.1, flood discharge for the 25 year return period is 139.73 m3/s. The capacity of the retention pond is 96.010 m3. The budget plan required for the construction of the pond is Rp.32.370.227.530,00. From the result, the solution that planned can reduce flood level up to 8% in Way Batu Merah Basin dan reduce flood hydrograph for the 25 year return period up to 11% and has delayed time for 8 minutes of flood coming to evacuate people. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Ambon City is a city located in Maluku Province and is a central of government
and a central of development. Way Batu Merah River which flows in the middle
of Ambon City becomes one of the main reason of the flood disaster that happens
every year and causes many harms in materil dan non-materil aspects. This
research is meant to design the structure that can be contributed to reduce flood
level in Way Batu Merah Basin. Structure that is designed include retention pond.
Based on hydrological and hydraulics analysis with HECRAS 6.1, flood discharge
for the 25 year return period is 139.73 m3/s. The capacity of the retention pond is
96.010 m3. The budget plan required for the construction of the pond is
Rp.32.370.227.530,00. From the result, the solution that planned can reduce flood
level up to 8% in Way Batu Merah Basin dan reduce flood hydrograph for the 25
year return period up to 11% and has delayed time for 8 minutes of flood coming
to evacuate people.
|
format |
Final Project |
author |
Magdalena Simangunsong, Diana |
spellingShingle |
Magdalena Simangunsong, Diana RETENTION POND DESIGN TO REDUCE FLOOD LEVEL IN WAY BATU MERAH BASIN AMBON |
author_facet |
Magdalena Simangunsong, Diana |
author_sort |
Magdalena Simangunsong, Diana |
title |
RETENTION POND DESIGN TO REDUCE FLOOD LEVEL IN WAY BATU MERAH BASIN AMBON |
title_short |
RETENTION POND DESIGN TO REDUCE FLOOD LEVEL IN WAY BATU MERAH BASIN AMBON |
title_full |
RETENTION POND DESIGN TO REDUCE FLOOD LEVEL IN WAY BATU MERAH BASIN AMBON |
title_fullStr |
RETENTION POND DESIGN TO REDUCE FLOOD LEVEL IN WAY BATU MERAH BASIN AMBON |
title_full_unstemmed |
RETENTION POND DESIGN TO REDUCE FLOOD LEVEL IN WAY BATU MERAH BASIN AMBON |
title_sort |
retention pond design to reduce flood level in way batu merah basin ambon |
url |
https://digilib.itb.ac.id/gdl/view/67289 |
_version_ |
1822005402673348608 |