RETENTION POND DESIGN TO REDUCE FLOOD LEVEL IN WAY BATU MERAH BASIN AMBON

Ambon City is a city located in Maluku Province and is a central of government and a central of development. Way Batu Merah River which flows in the middle of Ambon City becomes one of the main reason of the flood disaster that happens every year and causes many harms in materil dan non-materil a...

Full description

Saved in:
Bibliographic Details
Main Author: Magdalena Simangunsong, Diana
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/67289
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:67289
spelling id-itb.:672892022-08-19T10:42:18ZRETENTION POND DESIGN TO REDUCE FLOOD LEVEL IN WAY BATU MERAH BASIN AMBON Magdalena Simangunsong, Diana Indonesia Final Project Flood, Retention Pond, Way Batu Merah River, HecRAS 6.1 INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/67289 Ambon City is a city located in Maluku Province and is a central of government and a central of development. Way Batu Merah River which flows in the middle of Ambon City becomes one of the main reason of the flood disaster that happens every year and causes many harms in materil dan non-materil aspects. This research is meant to design the structure that can be contributed to reduce flood level in Way Batu Merah Basin. Structure that is designed include retention pond. Based on hydrological and hydraulics analysis with HECRAS 6.1, flood discharge for the 25 year return period is 139.73 m3/s. The capacity of the retention pond is 96.010 m3. The budget plan required for the construction of the pond is Rp.32.370.227.530,00. From the result, the solution that planned can reduce flood level up to 8% in Way Batu Merah Basin dan reduce flood hydrograph for the 25 year return period up to 11% and has delayed time for 8 minutes of flood coming to evacuate people. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Ambon City is a city located in Maluku Province and is a central of government and a central of development. Way Batu Merah River which flows in the middle of Ambon City becomes one of the main reason of the flood disaster that happens every year and causes many harms in materil dan non-materil aspects. This research is meant to design the structure that can be contributed to reduce flood level in Way Batu Merah Basin. Structure that is designed include retention pond. Based on hydrological and hydraulics analysis with HECRAS 6.1, flood discharge for the 25 year return period is 139.73 m3/s. The capacity of the retention pond is 96.010 m3. The budget plan required for the construction of the pond is Rp.32.370.227.530,00. From the result, the solution that planned can reduce flood level up to 8% in Way Batu Merah Basin dan reduce flood hydrograph for the 25 year return period up to 11% and has delayed time for 8 minutes of flood coming to evacuate people.
format Final Project
author Magdalena Simangunsong, Diana
spellingShingle Magdalena Simangunsong, Diana
RETENTION POND DESIGN TO REDUCE FLOOD LEVEL IN WAY BATU MERAH BASIN AMBON
author_facet Magdalena Simangunsong, Diana
author_sort Magdalena Simangunsong, Diana
title RETENTION POND DESIGN TO REDUCE FLOOD LEVEL IN WAY BATU MERAH BASIN AMBON
title_short RETENTION POND DESIGN TO REDUCE FLOOD LEVEL IN WAY BATU MERAH BASIN AMBON
title_full RETENTION POND DESIGN TO REDUCE FLOOD LEVEL IN WAY BATU MERAH BASIN AMBON
title_fullStr RETENTION POND DESIGN TO REDUCE FLOOD LEVEL IN WAY BATU MERAH BASIN AMBON
title_full_unstemmed RETENTION POND DESIGN TO REDUCE FLOOD LEVEL IN WAY BATU MERAH BASIN AMBON
title_sort retention pond design to reduce flood level in way batu merah basin ambon
url https://digilib.itb.ac.id/gdl/view/67289
_version_ 1822005402673348608