THE PLANNING OF GRAND THEATER CINEMA OF SENEN
The film industry, specifically in Indonesia’s capital, DKI Jakarta, has been actively growing, playing a big part in the national economy. The industry’s need for space to grow continues to increase. One of the projects focused on fulfilling this need is the Grand Theater Cinema of Senen, which fun...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/67922 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:67922 |
---|---|
spelling |
id-itb.:679222022-08-29T08:54:05ZTHE PLANNING OF GRAND THEATER CINEMA OF SENEN Tri Pangputra, Johansen Indonesia Final Project Construction implementation method, volume, productivity, scheduling, duration, costs INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/67922 The film industry, specifically in Indonesia’s capital, DKI Jakarta, has been actively growing, playing a big part in the national economy. The industry’s need for space to grow continues to increase. One of the projects focused on fulfilling this need is the Grand Theater Cinema of Senen, which functions as a platform and bridge within the community of filmmakers and film enthuasiasts. The Grand Theater Cinema of Senen is a multifunctional commercial area, equipped with a theater, library, gallery, and workshop. The building is 12,5 meters tall, consisting of a three-story main structure and an additional two-floor basement. This final project in the field of Construction Engineering Management aims to plan a method of implementation for building construction, a project schedule, and cost estimation needed to deliver the project on target. The planning includes construction implementation methods, work volume calculations, labor & heavy equipment productivity, labor allocations, duration calculations, project schedule determination, and estimation of construction costs consisting of direct and indirect costs. The Grand Theater Cinema of Senen project has a duration of 12 months with a project value of . text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
The film industry, specifically in Indonesia’s capital, DKI Jakarta, has been actively growing, playing a big part in the national economy. The industry’s need for space to grow continues to increase. One of the projects focused on fulfilling this need is the Grand Theater Cinema of Senen, which functions as a platform and bridge within the community of filmmakers and film enthuasiasts. The Grand Theater Cinema of Senen is a multifunctional commercial area, equipped with a theater, library, gallery, and workshop. The building is 12,5 meters tall, consisting of a three-story main structure and an additional two-floor basement.
This final project in the field of Construction Engineering Management aims to plan a method of implementation for building construction, a project schedule, and cost estimation needed to deliver the project on target. The planning includes construction implementation methods, work volume calculations, labor & heavy equipment productivity, labor allocations, duration calculations, project schedule determination, and estimation of construction costs consisting of direct and indirect costs. The Grand Theater Cinema of Senen project has a duration of 12 months with a project value of .
|
format |
Final Project |
author |
Tri Pangputra, Johansen |
spellingShingle |
Tri Pangputra, Johansen THE PLANNING OF GRAND THEATER CINEMA OF SENEN |
author_facet |
Tri Pangputra, Johansen |
author_sort |
Tri Pangputra, Johansen |
title |
THE PLANNING OF GRAND THEATER CINEMA OF SENEN |
title_short |
THE PLANNING OF GRAND THEATER CINEMA OF SENEN |
title_full |
THE PLANNING OF GRAND THEATER CINEMA OF SENEN |
title_fullStr |
THE PLANNING OF GRAND THEATER CINEMA OF SENEN |
title_full_unstemmed |
THE PLANNING OF GRAND THEATER CINEMA OF SENEN |
title_sort |
planning of grand theater cinema of senen |
url |
https://digilib.itb.ac.id/gdl/view/67922 |
_version_ |
1822005590678831104 |