TPST Bantargebang is an integrated waste management facility located in Kota Bekasi. In the landfilling process, there is a potential for environmental pollution due to leachate. To overcome this, TPST Bantargebang owns three Instalasi Pengolahan Lindi (IPL). The percentage of leachate handling for...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/67939 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:67939 |
---|---|
spelling |
id-itb.:679392022-08-29T09:39:29ZCOST-BENEFIT ANALYSIS OF LEACHATE TREATMENT SYSTEM AT BANTARGEBANG INTEGRATED WASTE MANAGEMENT FACILITY Leony, Vanecia Teknik saniter dan perkotaan; teknik perlindungan lingkungan Indonesia Theses leachate, treatment system, IPL, cost-benefit analysis, alternative INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/67939 TPST Bantargebang is an integrated waste management facility located in Kota Bekasi. In the landfilling process, there is a potential for environmental pollution due to leachate. To overcome this, TPST Bantargebang owns three Instalasi Pengolahan Lindi (IPL). The percentage of leachate handling for the overall IPL is quite low due to the limited IPL handling capacity. Untreated leachate runoff can cause river pollution. With the existing conditions, Business as Usual scenario can be determined from the leachate treatment system at TPST Bantargebang. The prediction of leachate generation is calculated to determine the quantity of leachate that should be processed. The leachate handling capacity of each IPL is determined from the result of discharge calculation based on the processing organic load. The alternatives leachate treatment systems are based on the leachate handling capacity of each scenario. Utilization of IPL 2 for scenario 1, IPL 2 and IPL 3 for scenario 2, as well as IPL 1, IPL2, and IPL 3 for scenario 3. Cost and benefit analysis is applied to each alternative. The economic feasibility of each alternative is determined by calculating the value of the benefit-cost ratio (BCR) and net present value (NPV). The total discharge generated from all zones is 2081,936 m3/day. The leachate handling capacity for scenarios 1, 2, and 3 is 10-14%, 24.50-62.04%, and 36.41-83.23%. From the cost-benefit analysis of Business as Usual, the cost incurred by UPST Bantargebang is currently Rp 14,160,083,219.07. The results of cost-benefit analysis of each alternative can be seen in Table V.43. From the economic feasibility analysis, it is found that scenario 1 with maximum discharge has the highest BCR value, while scenario 3 has the highest NPV value. Considering the quantity and quality of the treated leachate, scenario 3 becomes the main choice in the leachate treatment system development plan. The existence of IPL can reduce environmental impacts, especially on water bodies, as well as provide a positive impact through the use of treated leachate. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Teknik saniter dan perkotaan; teknik perlindungan lingkungan |
spellingShingle |
Teknik saniter dan perkotaan; teknik perlindungan lingkungan Leony, Vanecia COST-BENEFIT ANALYSIS OF LEACHATE TREATMENT SYSTEM AT BANTARGEBANG INTEGRATED WASTE MANAGEMENT FACILITY |
description |
TPST Bantargebang is an integrated waste management facility located in Kota Bekasi. In the landfilling process, there is a potential for environmental pollution due to leachate. To overcome this, TPST Bantargebang owns three Instalasi Pengolahan Lindi (IPL). The percentage of leachate handling for the overall IPL is quite low due to the limited IPL handling capacity. Untreated leachate runoff can cause river pollution. With the existing conditions, Business as Usual scenario can be determined from the leachate treatment system at TPST Bantargebang. The prediction of leachate generation is calculated to determine the quantity of leachate that should be processed. The leachate handling capacity of each IPL is determined from the result of discharge calculation based on the processing organic load. The alternatives leachate treatment systems are based on the leachate handling capacity of each scenario. Utilization of IPL 2 for scenario 1, IPL 2 and IPL 3 for scenario 2, as well as IPL 1, IPL2, and IPL 3 for scenario 3. Cost and benefit analysis is applied to each alternative. The economic feasibility of each alternative is determined by calculating the value of the benefit-cost ratio (BCR) and net present value (NPV).
The total discharge generated from all zones is 2081,936 m3/day. The leachate handling capacity for scenarios 1, 2, and 3 is 10-14%, 24.50-62.04%, and 36.41-83.23%. From the cost-benefit analysis of Business as Usual, the cost incurred by UPST Bantargebang is currently Rp 14,160,083,219.07. The results of cost-benefit analysis of each alternative can be seen in Table V.43. From the economic feasibility analysis, it is found that scenario 1 with maximum discharge has the highest BCR value, while scenario 3 has the highest NPV value. Considering the quantity and quality of the treated leachate, scenario 3 becomes the main choice in the leachate treatment system development plan. The existence of IPL can reduce environmental impacts, especially on water bodies, as well as provide a positive impact through the use of treated leachate.
|
format |
Theses |
author |
Leony, Vanecia |
author_facet |
Leony, Vanecia |
author_sort |
Leony, Vanecia |
title |
COST-BENEFIT ANALYSIS OF LEACHATE TREATMENT SYSTEM AT BANTARGEBANG INTEGRATED WASTE MANAGEMENT FACILITY |
title_short |
COST-BENEFIT ANALYSIS OF LEACHATE TREATMENT SYSTEM AT BANTARGEBANG INTEGRATED WASTE MANAGEMENT FACILITY |
title_full |
COST-BENEFIT ANALYSIS OF LEACHATE TREATMENT SYSTEM AT BANTARGEBANG INTEGRATED WASTE MANAGEMENT FACILITY |
title_fullStr |
COST-BENEFIT ANALYSIS OF LEACHATE TREATMENT SYSTEM AT BANTARGEBANG INTEGRATED WASTE MANAGEMENT FACILITY |
title_full_unstemmed |
COST-BENEFIT ANALYSIS OF LEACHATE TREATMENT SYSTEM AT BANTARGEBANG INTEGRATED WASTE MANAGEMENT FACILITY |
title_sort |
cost-benefit analysis of leachate treatment system at bantargebang integrated waste management facility |
url |
https://digilib.itb.ac.id/gdl/view/67939 |
_version_ |
1822005596351627264 |