CONSTRUCTION MANAGEMENT DESIGN OF TRANSFER HUB: REVITALIZATION IN MANGGARAI STATION AREA
The Manggarai area is a node area for public transportation in the Jabodetabek area. This area has two transportation buildings, namely Manggarai Station and Manggarai Terminal, which are meeting places for various modes of transportation such as trains, city transportation, and buses. This area...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/67985 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:67985 |
---|---|
spelling |
id-itb.:679852022-08-29T14:58:15ZCONSTRUCTION MANAGEMENT DESIGN OF TRANSFER HUB: REVITALIZATION IN MANGGARAI STATION AREA Nabhan Afif, Muhammad Hak sipil dan politik Indonesia Final Project Construction Methods, Cost Estimates, Scheduling, Ms. Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/67985 The Manggarai area is a node area for public transportation in the Jabodetabek area. This area has two transportation buildings, namely Manggarai Station and Manggarai Terminal, which are meeting places for various modes of transportation such as trains, city transportation, and buses. This area is planned to be the largest node area with Manggarai Station being the central station which has 18 active train lines. To support this plan, the DKI Jakarta Provincial Government plans to create a Transfer Hub facility consisting of fast lanes, commercial areas, and apartments. The facility with an area of 16,000 m2 is expected to increase circulation and accessibility of movement, tourism attraction, and the surrounding economic conditions. The scope of this design is to analyze environmental conditions, make Work Breakdown Structures, plan construction methods, volume quantification, cost estimates, and detailed scheduling for preparation work, dewatering and excavation work, commercial superstructure work, and apartment work. The estimated cost of this project refers to the Permen PUPR No 1 Tahun 2022 and the estimate cost value is Rp149.082.482.623,83 for the work analyzed. While the scheduling process using Ms. Project software and obtained the duration of work for 630 days or about 21 months. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Hak sipil dan politik |
spellingShingle |
Hak sipil dan politik Nabhan Afif, Muhammad CONSTRUCTION MANAGEMENT DESIGN OF TRANSFER HUB: REVITALIZATION IN MANGGARAI STATION AREA |
description |
The Manggarai area is a node area for public transportation in the Jabodetabek area.
This area has two transportation buildings, namely Manggarai Station and
Manggarai Terminal, which are meeting places for various modes of transportation
such as trains, city transportation, and buses. This area is planned to be the largest
node area with Manggarai Station being the central station which has 18 active train
lines. To support this plan, the DKI Jakarta Provincial Government plans to create
a Transfer Hub facility consisting of fast lanes, commercial areas, and apartments.
The facility with an area of 16,000 m2 is expected to increase circulation and
accessibility of movement, tourism attraction, and the surrounding economic
conditions. The scope of this design is to analyze environmental conditions, make
Work Breakdown Structures, plan construction methods, volume quantification,
cost estimates, and detailed scheduling for preparation work, dewatering and
excavation work, commercial superstructure work, and apartment work. The
estimated cost of this project refers to the Permen PUPR No 1 Tahun 2022 and the
estimate cost value is Rp149.082.482.623,83 for the work analyzed. While the
scheduling process using Ms. Project software and obtained the duration of work
for 630 days or about 21 months. |
format |
Final Project |
author |
Nabhan Afif, Muhammad |
author_facet |
Nabhan Afif, Muhammad |
author_sort |
Nabhan Afif, Muhammad |
title |
CONSTRUCTION MANAGEMENT DESIGN OF TRANSFER HUB: REVITALIZATION IN MANGGARAI STATION AREA |
title_short |
CONSTRUCTION MANAGEMENT DESIGN OF TRANSFER HUB: REVITALIZATION IN MANGGARAI STATION AREA |
title_full |
CONSTRUCTION MANAGEMENT DESIGN OF TRANSFER HUB: REVITALIZATION IN MANGGARAI STATION AREA |
title_fullStr |
CONSTRUCTION MANAGEMENT DESIGN OF TRANSFER HUB: REVITALIZATION IN MANGGARAI STATION AREA |
title_full_unstemmed |
CONSTRUCTION MANAGEMENT DESIGN OF TRANSFER HUB: REVITALIZATION IN MANGGARAI STATION AREA |
title_sort |
construction management design of transfer hub: revitalization in manggarai station area |
url |
https://digilib.itb.ac.id/gdl/view/67985 |
_version_ |
1822278082651750400 |