DESIGN OF IBIS STYLE CANDILAND HOTEL IN SEMARANG
The building design is done for Ibis Style Candiland Semarang Hotel consisting of 11 floors and 3 semi-basements. The building is designed as building frame system with special reinforced concrete shear walls with loads based on SNI 1727:2020 and earthquake resistance planning is carried out base...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/68447 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:68447 |
---|---|
spelling |
id-itb.:684472022-09-15T13:16:32ZDESIGN OF IBIS STYLE CANDILAND HOTEL IN SEMARANG Jonathan Soetjipto, Calvin Indonesia Final Project bottom-up method, raft foundation, secant pile embedded wall, building frame system with special reinforced concrete shear wall, earthquake resistant structure, construction method, construction scheduling, construction cost estimation, PLAXIS 2D, ETABS. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/68447 The building design is done for Ibis Style Candiland Semarang Hotel consisting of 11 floors and 3 semi-basements. The building is designed as building frame system with special reinforced concrete shear walls with loads based on SNI 1727:2020 and earthquake resistance planning is carried out based on SNI 1726:2019. Preliminary design calculations were performed manually while the modelling and structural analysis were performed using ETABS. Geotechnical design is carried out based on SNI 8460:2017. Secant pile is used as retaining wall with permanent ground anchor for the reinforcement which is modelled and analysed using PLAXIS 2D. The foundation used is raft foundation with analysis carried out manually to obtain soil bearing capacity and further analysis using ETABS program to analyse axial, lateral, and settlement that occur in the foundation. Construction management that will be planned includes site layout design, details of the work breakdown structure, methods of construction from preparation work, soil, substructure, and superstructure, as well as preparation of construction implementation schedule and construction cost estimation. The construction method used in this building is bottom-up method text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
The building design is done for Ibis Style Candiland Semarang Hotel consisting of
11 floors and 3 semi-basements. The building is designed as building frame system
with special reinforced concrete shear walls with loads based on SNI 1727:2020
and earthquake resistance planning is carried out based on SNI 1726:2019.
Preliminary design calculations were performed manually while the modelling and
structural analysis were performed using ETABS. Geotechnical design is carried
out based on SNI 8460:2017. Secant pile is used as retaining wall with permanent
ground anchor for the reinforcement which is modelled and analysed using PLAXIS
2D. The foundation used is raft foundation with analysis carried out manually to
obtain soil bearing capacity and further analysis using ETABS program to analyse
axial, lateral, and settlement that occur in the foundation. Construction management
that will be planned includes site layout design, details of the work breakdown
structure, methods of construction from preparation work, soil, substructure, and
superstructure, as well as preparation of construction implementation schedule and
construction cost estimation. The construction method used in this building is
bottom-up method
|
format |
Final Project |
author |
Jonathan Soetjipto, Calvin |
spellingShingle |
Jonathan Soetjipto, Calvin DESIGN OF IBIS STYLE CANDILAND HOTEL IN SEMARANG |
author_facet |
Jonathan Soetjipto, Calvin |
author_sort |
Jonathan Soetjipto, Calvin |
title |
DESIGN OF IBIS STYLE CANDILAND HOTEL IN SEMARANG |
title_short |
DESIGN OF IBIS STYLE CANDILAND HOTEL IN SEMARANG |
title_full |
DESIGN OF IBIS STYLE CANDILAND HOTEL IN SEMARANG |
title_fullStr |
DESIGN OF IBIS STYLE CANDILAND HOTEL IN SEMARANG |
title_full_unstemmed |
DESIGN OF IBIS STYLE CANDILAND HOTEL IN SEMARANG |
title_sort |
design of ibis style candiland hotel in semarang |
url |
https://digilib.itb.ac.id/gdl/view/68447 |
_version_ |
1822278211719921664 |