DESIGN FOR CAPACITY UPRATING FOR DELI TUA WATER TREATMENT PLANT (WTP) TIRTANADI PDAM DELI SERDANG REGENCY NORTH SUMATERA

Tirtanadi PDAM is one of the water resource management companies in Medan City and parts of Deli Serdang Regency. The increase in population is very fast, accompanied by an increase in demand for clean water supplies, resulted in the amount of clean water being produced having to increase rapidly so...

Full description

Saved in:
Bibliographic Details
Main Author: A.B. Sidebang, Averky
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/68588
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:68588
spelling id-itb.:685882022-09-16T14:54:07ZDESIGN FOR CAPACITY UPRATING FOR DELI TUA WATER TREATMENT PLANT (WTP) TIRTANADI PDAM DELI SERDANG REGENCY NORTH SUMATERA A.B. Sidebang, Averky Indonesia Final Project Clean water, Deli Tua, Medan City, PDAM, WTP INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/68588 Tirtanadi PDAM is one of the water resource management companies in Medan City and parts of Deli Serdang Regency. The increase in population is very fast, accompanied by an increase in demand for clean water supplies, resulted in the amount of clean water being produced having to increase rapidly so that the existing installations could not meet these needs. This is the impetus for planning the development of the Deli Tua Water Treatment Plant (IPA) with the planning for the construction of a new WTP. In the analysis of water demand so that the goal of RISPAM Medan City is achieved 100% service, it is necessary to lack the WTP capacity of 900 liters per second. For raw water, it is taken from the Deli River which crosses the IPA planning area. The development period is carried out in two stages, namely the first stage until 2032 at 600 liters per second and in 2042 at 300 liters per second. In selecting the best alternative for the new IPA configuration, the Simple Additive Weighting (SAW) method was used. Then the selected alternative units were obtained, consisting of a bar screen unit, coagulation using a static mixer, a clariflocculator, rapid sand filtration, and disinfection with chlorine injection. The total minimum land area required for the construction of the second phase of the new WTP is 9,383 m². text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Tirtanadi PDAM is one of the water resource management companies in Medan City and parts of Deli Serdang Regency. The increase in population is very fast, accompanied by an increase in demand for clean water supplies, resulted in the amount of clean water being produced having to increase rapidly so that the existing installations could not meet these needs. This is the impetus for planning the development of the Deli Tua Water Treatment Plant (IPA) with the planning for the construction of a new WTP. In the analysis of water demand so that the goal of RISPAM Medan City is achieved 100% service, it is necessary to lack the WTP capacity of 900 liters per second. For raw water, it is taken from the Deli River which crosses the IPA planning area. The development period is carried out in two stages, namely the first stage until 2032 at 600 liters per second and in 2042 at 300 liters per second. In selecting the best alternative for the new IPA configuration, the Simple Additive Weighting (SAW) method was used. Then the selected alternative units were obtained, consisting of a bar screen unit, coagulation using a static mixer, a clariflocculator, rapid sand filtration, and disinfection with chlorine injection. The total minimum land area required for the construction of the second phase of the new WTP is 9,383 m².
format Final Project
author A.B. Sidebang, Averky
spellingShingle A.B. Sidebang, Averky
DESIGN FOR CAPACITY UPRATING FOR DELI TUA WATER TREATMENT PLANT (WTP) TIRTANADI PDAM DELI SERDANG REGENCY NORTH SUMATERA
author_facet A.B. Sidebang, Averky
author_sort A.B. Sidebang, Averky
title DESIGN FOR CAPACITY UPRATING FOR DELI TUA WATER TREATMENT PLANT (WTP) TIRTANADI PDAM DELI SERDANG REGENCY NORTH SUMATERA
title_short DESIGN FOR CAPACITY UPRATING FOR DELI TUA WATER TREATMENT PLANT (WTP) TIRTANADI PDAM DELI SERDANG REGENCY NORTH SUMATERA
title_full DESIGN FOR CAPACITY UPRATING FOR DELI TUA WATER TREATMENT PLANT (WTP) TIRTANADI PDAM DELI SERDANG REGENCY NORTH SUMATERA
title_fullStr DESIGN FOR CAPACITY UPRATING FOR DELI TUA WATER TREATMENT PLANT (WTP) TIRTANADI PDAM DELI SERDANG REGENCY NORTH SUMATERA
title_full_unstemmed DESIGN FOR CAPACITY UPRATING FOR DELI TUA WATER TREATMENT PLANT (WTP) TIRTANADI PDAM DELI SERDANG REGENCY NORTH SUMATERA
title_sort design for capacity uprating for deli tua water treatment plant (wtp) tirtanadi pdam deli serdang regency north sumatera
url https://digilib.itb.ac.id/gdl/view/68588
_version_ 1822933692233809920