THE DESIGN OF PLUMBING SYSTEM (CLEAN WATER, WASTEWATER, VENT, RAINWATER, AND FIRE EXTINGUISHER) AT BANDUNG PUBLIC LIBRARY
The Bandung City Public Library building consists of two buildings, namely the library building which has 5 floors with 1 basement and the auditorium building which consists of 1 floor. In designing the plumbing system for clean water, recycled water, waste water, vents, rainwater, and fire extin...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/68832 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | The Bandung City Public Library building consists of two buildings, namely the library
building which has 5 floors with 1 basement and the auditorium building which consists of 1
floor. In designing the plumbing system for clean water, recycled water, waste water, vents,
rainwater, and fire extinguishing systems, the SNI 8153:2015 standard on Plumbing Systems
in Buildings is used. The source of clean water from this building uses PDAM water with a
capacity of 36.94 m3 per day. Thus, the lower reservoir is planned for 27 m3 and 15 m3 for
the upper reservoir. For recycled water that comes from used gray water produced by floor
drains, sinks, and lavatory then processed first at the STP in the basement and also from
rainwater that is not treated first, a lower reservoir is planned for 24.75 m3 and 15 m3, but in
their use, recycled water is only used in the flushing process for the plumbing water closet. The
water used is accommodated in the ground water tank which is in the basement and the roof
tank which is on the roof floor. Clean water, recycled water and water for fire fighting systems
have their own or separate tanks to maintain the quality and quantity of water required for each
system. For the waste water system, a separate system is used, where gray water and black
water have different pipes, because gray water will be flowed to STP to be treated as recycled
water, and black water is directly channeled to the city's real pipe. For the vent system, a loop
system is used, in which the vent can serve a maximum of 8 plumbing devices, and is channeled
to the top of the building. Rainwater is piped using a gravity system, which is then routed to
recycled tanks for water use. The library building is classified as a light fire hazard and the
building construction is not flammable, so the fire extinguishing system uses automatic
sprinklers and fire extinguishers |
---|