MICRO HYDROPOWER PLANT PLANNING AT SABUGA WEIR, BANDUNG CITY, WEST JAVA

With the continous increase of human population, the demand for electricity would increase accordingly. Therefore, various efforts of electrical generation are needed to satisfy those increasing demand. The construction of Micro Hydropower Plant (MHP) at Sabuga Weir, Bandung City, West Java that uti...

Full description

Saved in:
Bibliographic Details
Main Author: Sunardi, Christlay
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/69033
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:69033
spelling id-itb.:690332022-09-19T22:27:29ZMICRO HYDROPOWER PLANT PLANNING AT SABUGA WEIR, BANDUNG CITY, WEST JAVA Sunardi, Christlay Indonesia Final Project MHP, Micro Hydropower Plant, dependable discharge, turbine, power capacity, energy, economic analysis. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/69033 With the continous increase of human population, the demand for electricity would increase accordingly. Therefore, various efforts of electrical generation are needed to satisfy those increasing demand. The construction of Micro Hydropower Plant (MHP) at Sabuga Weir, Bandung City, West Java that utilise existing weir, intake, and waterway may present as an economical and environment-friendly alternative in regard of increasing electrical supply for the public need. Based on the optimation calculation of electrical energy production, discharge with exceedance probability of 60% (3.33 m3/s) is determined to be utilized as the design discharge. Sabuga MHP produces 424.8 kW of electrical power with 17.12 m of gross head. The turbine used is kaplan turbine, with the runner sizing to 0.66 m in diameter, and a rotational speed of 1000 rpm. Investment capital of Rp. 52.16 billion is needed in purpose of constructing the Sabuga MHP with an annual benefit of Rp. 1.89 billion per year, which produces annual BCR of 0.036, payback period of 27 years 8 months, internal rate of return of 16%, and cost per kW of Rp. 122,792,611. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description With the continous increase of human population, the demand for electricity would increase accordingly. Therefore, various efforts of electrical generation are needed to satisfy those increasing demand. The construction of Micro Hydropower Plant (MHP) at Sabuga Weir, Bandung City, West Java that utilise existing weir, intake, and waterway may present as an economical and environment-friendly alternative in regard of increasing electrical supply for the public need. Based on the optimation calculation of electrical energy production, discharge with exceedance probability of 60% (3.33 m3/s) is determined to be utilized as the design discharge. Sabuga MHP produces 424.8 kW of electrical power with 17.12 m of gross head. The turbine used is kaplan turbine, with the runner sizing to 0.66 m in diameter, and a rotational speed of 1000 rpm. Investment capital of Rp. 52.16 billion is needed in purpose of constructing the Sabuga MHP with an annual benefit of Rp. 1.89 billion per year, which produces annual BCR of 0.036, payback period of 27 years 8 months, internal rate of return of 16%, and cost per kW of Rp. 122,792,611.
format Final Project
author Sunardi, Christlay
spellingShingle Sunardi, Christlay
MICRO HYDROPOWER PLANT PLANNING AT SABUGA WEIR, BANDUNG CITY, WEST JAVA
author_facet Sunardi, Christlay
author_sort Sunardi, Christlay
title MICRO HYDROPOWER PLANT PLANNING AT SABUGA WEIR, BANDUNG CITY, WEST JAVA
title_short MICRO HYDROPOWER PLANT PLANNING AT SABUGA WEIR, BANDUNG CITY, WEST JAVA
title_full MICRO HYDROPOWER PLANT PLANNING AT SABUGA WEIR, BANDUNG CITY, WEST JAVA
title_fullStr MICRO HYDROPOWER PLANT PLANNING AT SABUGA WEIR, BANDUNG CITY, WEST JAVA
title_full_unstemmed MICRO HYDROPOWER PLANT PLANNING AT SABUGA WEIR, BANDUNG CITY, WEST JAVA
title_sort micro hydropower plant planning at sabuga weir, bandung city, west java
url https://digilib.itb.ac.id/gdl/view/69033
_version_ 1822278380999933952