DESIGN OF DOMESTIC FLUORESCENT LAMP WASTE RECYCLING FACILITY IN BANDUNG CITY
The mercury in fluorescent lamp waste can threaten human health and create a bioaccumulation. There is no domestic fluorescent lamps waste in Bandung City Therefore, a domestic fluorescent lamp waste recycling facility was designed in Bandung City with an operational period of 2024-2033. The amou...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/69355 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:69355 |
---|---|
spelling |
id-itb.:693552022-09-21T15:44:44ZDESIGN OF DOMESTIC FLUORESCENT LAMP WASTE RECYCLING FACILITY IN BANDUNG CITY Reval Hamdallah, Juang Teknik saniter dan perkotaan; teknik perlindungan lingkungan Indonesia Final Project Bandung City, domestic, fluorescent lamp waste, recycling facility, generation INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/69355 The mercury in fluorescent lamp waste can threaten human health and create a bioaccumulation. There is no domestic fluorescent lamps waste in Bandung City Therefore, a domestic fluorescent lamp waste recycling facility was designed in Bandung City with an operational period of 2024-2033. The amount of waste generated is determined by the Modified Market Supply method. The highest annual yield is obtained in the city of Bandung as much as 461.178 pcs of straight type, 1.563,229 pcs of compact type, and 134.025 pcs of circular type. Collection scenario of 50% with a service level of 86.54% is planned. Every day, 623,17 kg of waste goes to the recycling facility. Management activities include communal collection with roll-off dumpsters distributed at 12 points and transportation using CDD Wingbox trucks. The stages of recycling at the facility include feeding, crushing, washing, separation, adsorption, and absorption. The required investment cost is Rp7,984,127,741 with operational cost of Rp6,585,249,284/year. The income is Rp709,239,164/year. Based on Net Present Value (NPV) and Benefit Cost Ratio (BCR), NPV value < 0 and the BCR value < 1 ( not economically feasible). An Extended Producer Responsibility (EPR) system by increasing the cost of lamps required is Rp3,191/pcs. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Teknik saniter dan perkotaan; teknik perlindungan lingkungan |
spellingShingle |
Teknik saniter dan perkotaan; teknik perlindungan lingkungan Reval Hamdallah, Juang DESIGN OF DOMESTIC FLUORESCENT LAMP WASTE RECYCLING FACILITY IN BANDUNG CITY |
description |
The mercury in fluorescent lamp waste can threaten human health and
create a bioaccumulation. There is no domestic fluorescent lamps waste in
Bandung City Therefore, a domestic fluorescent lamp waste recycling facility was
designed in Bandung City with an operational period of 2024-2033. The amount of
waste generated is determined by the Modified Market Supply method. The highest
annual yield is obtained in the city of Bandung as much as 461.178 pcs of straight
type, 1.563,229 pcs of compact type, and 134.025 pcs of circular type. Collection
scenario of 50% with a service level of 86.54% is planned. Every day, 623,17 kg of
waste goes to the recycling facility. Management activities include communal
collection with roll-off dumpsters distributed at 12 points and transportation using
CDD Wingbox trucks. The stages of recycling at the facility include feeding,
crushing, washing, separation, adsorption, and absorption. The required
investment cost is Rp7,984,127,741 with operational cost of Rp6,585,249,284/year.
The income is Rp709,239,164/year. Based on Net Present Value (NPV) and Benefit
Cost Ratio (BCR), NPV value < 0 and the BCR value < 1 ( not economically
feasible). An Extended Producer Responsibility (EPR) system by increasing the
cost of lamps required is Rp3,191/pcs. |
format |
Final Project |
author |
Reval Hamdallah, Juang |
author_facet |
Reval Hamdallah, Juang |
author_sort |
Reval Hamdallah, Juang |
title |
DESIGN OF DOMESTIC FLUORESCENT LAMP WASTE RECYCLING FACILITY IN BANDUNG CITY |
title_short |
DESIGN OF DOMESTIC FLUORESCENT LAMP WASTE RECYCLING FACILITY IN BANDUNG CITY |
title_full |
DESIGN OF DOMESTIC FLUORESCENT LAMP WASTE RECYCLING FACILITY IN BANDUNG CITY |
title_fullStr |
DESIGN OF DOMESTIC FLUORESCENT LAMP WASTE RECYCLING FACILITY IN BANDUNG CITY |
title_full_unstemmed |
DESIGN OF DOMESTIC FLUORESCENT LAMP WASTE RECYCLING FACILITY IN BANDUNG CITY |
title_sort |
design of domestic fluorescent lamp waste recycling facility in bandung city |
url |
https://digilib.itb.ac.id/gdl/view/69355 |
_version_ |
1822006028031492096 |