ESTIMATION AND ECONOMIC OPTIMIZATION OF BLOCK M NICKEL RESERVES IN PT ANEKA TAMBANG TBK, SOUTHEAST SULAWESI PROVINCE

One type of mining commodity in Indonesia is nickel. Nickel is a raw material needed by many industries, such as stainless steel, batteries, alloys, and metal plating. Because it is needed for various industrial purposes, nickel is considered a strategic commodity. Based on this, the availability...

Full description

Saved in:
Bibliographic Details
Main Author: Jerhikma
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/69372
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:69372
spelling id-itb.:693722022-09-21T17:55:56ZESTIMATION AND ECONOMIC OPTIMIZATION OF BLOCK M NICKEL RESERVES IN PT ANEKA TAMBANG TBK, SOUTHEAST SULAWESI PROVINCE Jerhikma Indonesia Final Project nickel laterite, reserves, technical, economic INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/69372 One type of mining commodity in Indonesia is nickel. Nickel is a raw material needed by many industries, such as stainless steel, batteries, alloys, and metal plating. Because it is needed for various industrial purposes, nickel is considered a strategic commodity. Based on this, the availability of nickel reserves in Indonesia is very important to support the sustainability of the industry. One of the companies that produce nickel is PT Aneka Tambang Tbk, where the company has one of the Mining Business License Areas in Southeast Sulawesi, especially in block M. In this study, an estimation of nickel reserves in Block M was carried out by considering several modifying factors. In addition, the economic optimization of Block M nickel reserves was carried out by conducting sensitivity analysis on several scenarios of mining age which will affect the parameters of commodity selling prices and changes in operating costs. The research was conducted using the literature study method and processing secondary data from PT Aneka Tambang Tbk. The modifying factors used to convert resources into reserves are mining factors (pit optimization, pit design, and mine scheduling) and economics (economic feasibility). After receiving the modifier factors modifying factors, the Block M nickel reserves are technically and economically feasible to mine, which are estimated at 0.335 million wmt with a Ni grade of 1.77%. In addition, based on the results of economic analysis, optimizing the economy of Block M reserves, it can be done by increasing production targets. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description One type of mining commodity in Indonesia is nickel. Nickel is a raw material needed by many industries, such as stainless steel, batteries, alloys, and metal plating. Because it is needed for various industrial purposes, nickel is considered a strategic commodity. Based on this, the availability of nickel reserves in Indonesia is very important to support the sustainability of the industry. One of the companies that produce nickel is PT Aneka Tambang Tbk, where the company has one of the Mining Business License Areas in Southeast Sulawesi, especially in block M. In this study, an estimation of nickel reserves in Block M was carried out by considering several modifying factors. In addition, the economic optimization of Block M nickel reserves was carried out by conducting sensitivity analysis on several scenarios of mining age which will affect the parameters of commodity selling prices and changes in operating costs. The research was conducted using the literature study method and processing secondary data from PT Aneka Tambang Tbk. The modifying factors used to convert resources into reserves are mining factors (pit optimization, pit design, and mine scheduling) and economics (economic feasibility). After receiving the modifier factors modifying factors, the Block M nickel reserves are technically and economically feasible to mine, which are estimated at 0.335 million wmt with a Ni grade of 1.77%. In addition, based on the results of economic analysis, optimizing the economy of Block M reserves, it can be done by increasing production targets.
format Final Project
author Jerhikma
spellingShingle Jerhikma
ESTIMATION AND ECONOMIC OPTIMIZATION OF BLOCK M NICKEL RESERVES IN PT ANEKA TAMBANG TBK, SOUTHEAST SULAWESI PROVINCE
author_facet Jerhikma
author_sort Jerhikma
title ESTIMATION AND ECONOMIC OPTIMIZATION OF BLOCK M NICKEL RESERVES IN PT ANEKA TAMBANG TBK, SOUTHEAST SULAWESI PROVINCE
title_short ESTIMATION AND ECONOMIC OPTIMIZATION OF BLOCK M NICKEL RESERVES IN PT ANEKA TAMBANG TBK, SOUTHEAST SULAWESI PROVINCE
title_full ESTIMATION AND ECONOMIC OPTIMIZATION OF BLOCK M NICKEL RESERVES IN PT ANEKA TAMBANG TBK, SOUTHEAST SULAWESI PROVINCE
title_fullStr ESTIMATION AND ECONOMIC OPTIMIZATION OF BLOCK M NICKEL RESERVES IN PT ANEKA TAMBANG TBK, SOUTHEAST SULAWESI PROVINCE
title_full_unstemmed ESTIMATION AND ECONOMIC OPTIMIZATION OF BLOCK M NICKEL RESERVES IN PT ANEKA TAMBANG TBK, SOUTHEAST SULAWESI PROVINCE
title_sort estimation and economic optimization of block m nickel reserves in pt aneka tambang tbk, southeast sulawesi province
url https://digilib.itb.ac.id/gdl/view/69372
_version_ 1822006033003839488