TUNNEL STABILITY ANALYSIS USING RMR METHOD, Q SYSTEM, AND FINITE ELEMENT IN TUNNEL 2, KCJB, JATILUHUR, PURWAKARTA DISTRICT, WEST JAVA
The Jakarta-Bandung High-Speed Rail Tunnel (Jakarta-Bandung HSR) is part of a national strategic project. In a tunnel construction project, there will be differences in lithology, discontinuities, rock weathering levels, and groundwater conditions which have potential to become obstacles. However, t...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/69437 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |