PENENTUAN DAERAH RESAPAN SISTEM PANAS BUMI GUNUNG WAYANG WINDU, JAWA BARAT
Wayang Windu is one of productive geothermal fields in West Java which is dominated by two phase reservoir system. Until 2003, 30 wells had been drilled and used to support a unit of 110 MWe geothermal electricity power plant. The origin of fluids and recharge area are important information in ma...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/69609 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |