INVESTMENT PROJECT ANALYSIS PIT C2 BLOCK 8 USING DISCOUNTED CASH FLOW (DCF) & REAL OPTIONS VALUATION (ROV) (CASE STUDY OF PT.BERAU COAL)
Pit C2 Block 8 Binungan Mining Operation Area 2 PT Berau Coal is one of the coal mining operational areas with multi-seam characteristics, coal seam slope at intervals of 40 – 60 degrees, the thickness of coal seam at intervals of 0.5 – 5 meters, and variations thickness between loads. at intervals...
Saved in:
Main Author: | Bahri S, Syamsul |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/69762 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
INVESTMENT PROJECT ANALYSIS PIT CACD BLOCK 8 , USING DISCOUNTED CASH FLOW (DCF) (CASE STUDY OF PT. BERAU COAL)
by: Zea Ardiansyah, Pandu -
ECONOMIC VALUATION OF OPEN PIT COAL MINING SCENARIO IN PT BERAU COAL SITE BINUNGAN BLOCK 8: COMPARATION OF DISCOUNTED CASH FLOW METHOD AND MONTE CARLO SIMULATION
by: Depi Putra, Mahardhika -
INVESTMENT PROJECT ANALYSIS OF PT BERAU COAL BLOCK A, BLOCK B AND BLOCK C COAL MINING PROJECT USING DISCOUNTED CASH FLOW METHOD
by: Wayan Supriharta, Ida -
INVESTMENT PROJECT ANALYSIS OF PT. BERAU COAL BLOCK 5-6 BINUNGAN USING DISCOUNTED CASH FLOW METHOD
by: Ilham Mury Nanda, Ridho -
INVESTMENT PROJECT ANALYSIS OF PTBC BLOCK 9 COAL MINING PROJECT USING DISCOUNTED CASH FLOW AND REAL OPTION VALUATION METHOD
by: Prio Prakoso, Anjas