WELL WORKOVER PROGRAM DEVELOPMENT PROCESS IMPROVEMENT BY USING LEAN SIX SIGMA FRAMEWORK AT SUMATERA OIL COMPANY
Sumatera Oil Company (SOC) is well-known for its large production of crude oil in Indonesia. Facing the upcoming end of the contract with the Indonesian government, SOC relies heavily on workover operation to maintain its production level. The condition challenges the D&C department to catch...
Saved in:
Main Author: | Arianto Tampubolon, Daniel |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/70167 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
WORKOVER AND WELL SERVICE PERFORMANCE IMPROVEMENT USING LEAN SIX SIGMA CASE STUDY: WORKOVER AND WELL SERVICE ACTIVITY OF PT AAA
by: Adi Prasetyo, Bayu -
OPERATIONAL TIME & COST IMPROVEMENT FOR ROUTINE SERVICE JOB AT RIG GBT-09 BY USING LEAN SIX SIGMA FRAMEWORK AT BLUE OIL COMPANY
by: Sintong O Tampubolon, Arnold -
PROCESS IMPROVEMENT DURING INITIAL COOLING DOWN WELL UTILIZING LEAN SIX SIGMA METHOD CASE STUDY: WORKOVER AND WELL SERVICE ACTIVITY OF PT. AHN
by: Huntadi Nugraha, Alfonsus -
OIL WELL PUT ON PRODUCTION CYCLE TIME IMPROVEMENT AT IOC-CORP USING LEAN SIX SIGMA METHODOLOGY
by: Sujana Putra, Doni -
PROCESS IMPROVEMENT ON WORKOVER RIG CONTRACT TRANSITION TO ELIMINATE DELAY DELIVERY OF NEW-ENTRANT CONTRACTOR BY USING LEAN SIGMA METHOD
by: Arliyando, Lamdamatra