RAINFED POND DESIGN TO FULFILL THE WATER NEEDS IN KELUBI VILLAGE, BELITUNG TIMUR DISTRICT
The water needs in Kelubi Village, Manggar District is always increasing as the years go by. Rain water is one of many sources of water that can be utilized by the people in the Kelubi Village to fulfill their water needs. As of now, there are only 25,6% from total families in Kelubi Village that...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/70187 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:70187 |
---|---|
spelling |
id-itb.:701872022-12-27T10:23:05ZRAINFED POND DESIGN TO FULFILL THE WATER NEEDS IN KELUBI VILLAGE, BELITUNG TIMUR DISTRICT Oliver Zaki, Dhani Indonesia Final Project pond, water needs, Kelubi village, rainfed INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/70187 The water needs in Kelubi Village, Manggar District is always increasing as the years go by. Rain water is one of many sources of water that can be utilized by the people in the Kelubi Village to fulfill their water needs. As of now, there are only 25,6% from total families in Kelubi Village that the water needs are served by PDAM. This is a challenge for the local government to get 100% of its villagers have sufficient access to water. Rainfed pond can pose as one of many solutions to solve this water challenge. The rainfed pond is planned to have a total volume of 132.328,949 m3 and has a depth of 5 meters. The rainfed pond is planned to be built by excavating and piling the site plan until the soil are on the same level. This is meant for the rainfall runoff from the catchment area to be able to enter the pond so that the pond has extra water sources aside from the rainfall that directly enter the pond. This rainfed pond is also going to have a spillway that has a height of 4 meters from the bottom of the pond and a pump house that will act as the pond’s outlet. The collected water from the local rain will be distributed to a water treatment infrastructure that is located not far from the pond site. The total cost for this pond to be built is Rp8,274,700,439.93. It is hoped that the collected rainwater in the ponds can act as an extra water supply so that the water demand from local villagers can be fulfilled for as much as they need. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
The water needs in Kelubi Village, Manggar District is always increasing as the
years go by. Rain water is one of many sources of water that can be utilized by the
people in the Kelubi Village to fulfill their water needs. As of now, there are only
25,6% from total families in Kelubi Village that the water needs are served by
PDAM. This is a challenge for the local government to get 100% of its villagers
have sufficient access to water. Rainfed pond can pose as one of many solutions to
solve this water challenge. The rainfed pond is planned to have a total volume of
132.328,949 m3 and has a depth of 5 meters. The rainfed pond is planned to be built
by excavating and piling the site plan until the soil are on the same level. This is
meant for the rainfall runoff from the catchment area to be able to enter the pond
so that the pond has extra water sources aside from the rainfall that directly enter
the pond. This rainfed pond is also going to have a spillway that has a height of 4
meters from the bottom of the pond and a pump house that will act as the pond’s
outlet. The collected water from the local rain will be distributed to a water
treatment infrastructure that is located not far from the pond site. The total cost for
this pond to be built is Rp8,274,700,439.93. It is hoped that the collected rainwater
in the ponds can act as an extra water supply so that the water demand from local
villagers can be fulfilled for as much as they need.
|
format |
Final Project |
author |
Oliver Zaki, Dhani |
spellingShingle |
Oliver Zaki, Dhani RAINFED POND DESIGN TO FULFILL THE WATER NEEDS IN KELUBI VILLAGE, BELITUNG TIMUR DISTRICT |
author_facet |
Oliver Zaki, Dhani |
author_sort |
Oliver Zaki, Dhani |
title |
RAINFED POND DESIGN TO FULFILL THE WATER NEEDS IN KELUBI VILLAGE, BELITUNG TIMUR DISTRICT |
title_short |
RAINFED POND DESIGN TO FULFILL THE WATER NEEDS IN KELUBI VILLAGE, BELITUNG TIMUR DISTRICT |
title_full |
RAINFED POND DESIGN TO FULFILL THE WATER NEEDS IN KELUBI VILLAGE, BELITUNG TIMUR DISTRICT |
title_fullStr |
RAINFED POND DESIGN TO FULFILL THE WATER NEEDS IN KELUBI VILLAGE, BELITUNG TIMUR DISTRICT |
title_full_unstemmed |
RAINFED POND DESIGN TO FULFILL THE WATER NEEDS IN KELUBI VILLAGE, BELITUNG TIMUR DISTRICT |
title_sort |
rainfed pond design to fulfill the water needs in kelubi village, belitung timur district |
url |
https://digilib.itb.ac.id/gdl/view/70187 |
_version_ |
1822278693206097920 |