SIMPLE MULTI ATTRIBUTE RATING TECHNIQUE APPROACH TO DECIDE BEST ALTERNATIVE FOR LLP COMPRESSOR INSTALLATION PROJECT AT OFFSHORE PLATFORM

Three of the Delta Mahakam Block's offshore gas fields are already at decline phase. LLP (low-low pressure) compressor project that has the objective of decreasing well operating pressure is proposed to maintain gas production levels. The project will be completed in three phases, beginning wit...

Full description

Saved in:
Bibliographic Details
Main Author: Noverri, Prayudi
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/70262
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:70262
spelling id-itb.:702622022-12-29T14:06:49ZSIMPLE MULTI ATTRIBUTE RATING TECHNIQUE APPROACH TO DECIDE BEST ALTERNATIVE FOR LLP COMPRESSOR INSTALLATION PROJECT AT OFFSHORE PLATFORM Noverri, Prayudi Manajemen umum Indonesia Theses Decision Analysis, Kepner-Tregoe, SMART method, Value Focused Thinking, Mature Gas Field Development INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/70262 Three of the Delta Mahakam Block's offshore gas fields are already at decline phase. LLP (low-low pressure) compressor project that has the objective of decreasing well operating pressure is proposed to maintain gas production levels. The project will be completed in three phases, beginning with the pilot project. The pilot project was completed in 2021, but the liquid rate was higher than expected. Higher liquid rates have delayed project completion and increased the cost of additional equipment. Root cause analysis with the Kepner-Tregoe method concludes that a higher liquid rate is due to inaccurate measurement. A new plan for the next phase must be decided in order to accommodate the most recent evaluation, which is based on the pilot project results. The research is focused on defining the best course of action that will be implemented for the third phase of the LLP project. The third phase, which is planned for eight offshore platforms, is the primary focus of this research. Recent evaluation of the third phase indicates cost increases, revenue reductions, and project execution delays. A Simple Multi Attribute Rating Technique (SMART) approach is used to evaluate four alternatives for the third phase, namely: (1) cancel the LLP compressor installation on eight offshore platforms; (2) install the compressor on eight offshore platforms in the same time frame; (3) install the LLP compressor only on selected offshore platforms; and (4) install the LLP compressor on eight offshore platforms in sequence. Five attributes for alternative evaluation are profit, cost, production, and compliance with regulations. Attributes are defined with value-focused thinking and refer to key performance indicators (KPIs) for companies. Based on the SMART result, it is concluded that LLP compressor installation on four selected offshore platforms is the best choice. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Noverri, Prayudi
SIMPLE MULTI ATTRIBUTE RATING TECHNIQUE APPROACH TO DECIDE BEST ALTERNATIVE FOR LLP COMPRESSOR INSTALLATION PROJECT AT OFFSHORE PLATFORM
description Three of the Delta Mahakam Block's offshore gas fields are already at decline phase. LLP (low-low pressure) compressor project that has the objective of decreasing well operating pressure is proposed to maintain gas production levels. The project will be completed in three phases, beginning with the pilot project. The pilot project was completed in 2021, but the liquid rate was higher than expected. Higher liquid rates have delayed project completion and increased the cost of additional equipment. Root cause analysis with the Kepner-Tregoe method concludes that a higher liquid rate is due to inaccurate measurement. A new plan for the next phase must be decided in order to accommodate the most recent evaluation, which is based on the pilot project results. The research is focused on defining the best course of action that will be implemented for the third phase of the LLP project. The third phase, which is planned for eight offshore platforms, is the primary focus of this research. Recent evaluation of the third phase indicates cost increases, revenue reductions, and project execution delays. A Simple Multi Attribute Rating Technique (SMART) approach is used to evaluate four alternatives for the third phase, namely: (1) cancel the LLP compressor installation on eight offshore platforms; (2) install the compressor on eight offshore platforms in the same time frame; (3) install the LLP compressor only on selected offshore platforms; and (4) install the LLP compressor on eight offshore platforms in sequence. Five attributes for alternative evaluation are profit, cost, production, and compliance with regulations. Attributes are defined with value-focused thinking and refer to key performance indicators (KPIs) for companies. Based on the SMART result, it is concluded that LLP compressor installation on four selected offshore platforms is the best choice.
format Theses
author Noverri, Prayudi
author_facet Noverri, Prayudi
author_sort Noverri, Prayudi
title SIMPLE MULTI ATTRIBUTE RATING TECHNIQUE APPROACH TO DECIDE BEST ALTERNATIVE FOR LLP COMPRESSOR INSTALLATION PROJECT AT OFFSHORE PLATFORM
title_short SIMPLE MULTI ATTRIBUTE RATING TECHNIQUE APPROACH TO DECIDE BEST ALTERNATIVE FOR LLP COMPRESSOR INSTALLATION PROJECT AT OFFSHORE PLATFORM
title_full SIMPLE MULTI ATTRIBUTE RATING TECHNIQUE APPROACH TO DECIDE BEST ALTERNATIVE FOR LLP COMPRESSOR INSTALLATION PROJECT AT OFFSHORE PLATFORM
title_fullStr SIMPLE MULTI ATTRIBUTE RATING TECHNIQUE APPROACH TO DECIDE BEST ALTERNATIVE FOR LLP COMPRESSOR INSTALLATION PROJECT AT OFFSHORE PLATFORM
title_full_unstemmed SIMPLE MULTI ATTRIBUTE RATING TECHNIQUE APPROACH TO DECIDE BEST ALTERNATIVE FOR LLP COMPRESSOR INSTALLATION PROJECT AT OFFSHORE PLATFORM
title_sort simple multi attribute rating technique approach to decide best alternative for llp compressor installation project at offshore platform
url https://digilib.itb.ac.id/gdl/view/70262
_version_ 1822991430688178176