RE-DESIGN OF TEMPORARY SHELTERS (TPS) INTO WASTE PROCESSING SITES WITH REDUCE, REUSE, RECYCLE PRINCIPLES (TPS 3R) IN MANDALAJATI DISTRICT, BANDUNG CITY
Bandung City, which is one of the major cities in Indonesia, is still having difficulties in handling the waste generated. According to data from the National Waste Management Information System, the waste generated by Bandung City per day reaches 1540 tons / day and the annual waste generation reac...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/70363 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:70363 |
---|---|
spelling |
id-itb.:703632023-01-09T10:34:50ZRE-DESIGN OF TEMPORARY SHELTERS (TPS) INTO WASTE PROCESSING SITES WITH REDUCE, REUSE, RECYCLE PRINCIPLES (TPS 3R) IN MANDALAJATI DISTRICT, BANDUNG CITY Salmah, Nida Indonesia Final Project Aerated Static Pile, Organic Waste, Waste Generation, Waste Temporary Shelter, 3R Waste management site. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/70363 Bandung City, which is one of the major cities in Indonesia, is still having difficulties in handling the waste generated. According to data from the National Waste Management Information System, the waste generated by Bandung City per day reaches 1540 tons / day and the annual waste generation reaches 562.03 tons / year. One of the solutions in handling waste is with TPS 3R. The research location of Cikadut TPS is in Mandalajati District, Bandung City. In planning the construction of TPS 3R, data is needed in the form of waste generation data, composition, waste density, population, service area, management system, and institutions. From the results of the study, it was found that the waste generation entering the TPS was 10,666.02 kg / day with an average density of 169.89 kg/m3, with the largest waste composition being organic waste as much as 48.36%. From the data obtained, the selected technology for processing organic waste is to use Aerated Static Pile technology and the selected development planning location is a location close to the old TPS. It is planned that there will be several facilities that will be in TPS 3R Cikadut, namely, loading-unloading area, sorting area, composting facility, inorganic special handling, storage warehouse, toilet, office, and workers' rest room. With the existence of TPS 3R Cikadut, it will reduce the waste load that needs to be processed. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Bandung City, which is one of the major cities in Indonesia, is still having difficulties in handling the waste generated. According to data from the National Waste Management Information System, the waste generated by Bandung City per day reaches 1540 tons / day and the annual waste generation reaches 562.03 tons / year. One of the solutions in handling waste is with TPS 3R. The research location of Cikadut TPS is in Mandalajati District, Bandung City. In planning the construction of TPS 3R, data is needed in the form of waste generation data, composition, waste density, population, service area, management system, and institutions. From the results of the study, it was found that the waste generation entering the TPS was 10,666.02 kg / day with an average density of 169.89 kg/m3, with the largest waste composition being organic waste as much as 48.36%. From the data obtained, the selected technology for processing organic waste is to use Aerated Static Pile technology and the selected development planning location is a location close to the old TPS. It is planned that there will be several facilities that will be in TPS 3R Cikadut, namely, loading-unloading area, sorting area, composting facility, inorganic special handling, storage warehouse, toilet, office, and workers' rest room. With the existence of TPS 3R Cikadut, it will reduce the waste load that needs to be processed. |
format |
Final Project |
author |
Salmah, Nida |
spellingShingle |
Salmah, Nida RE-DESIGN OF TEMPORARY SHELTERS (TPS) INTO WASTE PROCESSING SITES WITH REDUCE, REUSE, RECYCLE PRINCIPLES (TPS 3R) IN MANDALAJATI DISTRICT, BANDUNG CITY |
author_facet |
Salmah, Nida |
author_sort |
Salmah, Nida |
title |
RE-DESIGN OF TEMPORARY SHELTERS (TPS) INTO WASTE PROCESSING SITES WITH REDUCE, REUSE, RECYCLE PRINCIPLES (TPS 3R) IN MANDALAJATI DISTRICT, BANDUNG CITY |
title_short |
RE-DESIGN OF TEMPORARY SHELTERS (TPS) INTO WASTE PROCESSING SITES WITH REDUCE, REUSE, RECYCLE PRINCIPLES (TPS 3R) IN MANDALAJATI DISTRICT, BANDUNG CITY |
title_full |
RE-DESIGN OF TEMPORARY SHELTERS (TPS) INTO WASTE PROCESSING SITES WITH REDUCE, REUSE, RECYCLE PRINCIPLES (TPS 3R) IN MANDALAJATI DISTRICT, BANDUNG CITY |
title_fullStr |
RE-DESIGN OF TEMPORARY SHELTERS (TPS) INTO WASTE PROCESSING SITES WITH REDUCE, REUSE, RECYCLE PRINCIPLES (TPS 3R) IN MANDALAJATI DISTRICT, BANDUNG CITY |
title_full_unstemmed |
RE-DESIGN OF TEMPORARY SHELTERS (TPS) INTO WASTE PROCESSING SITES WITH REDUCE, REUSE, RECYCLE PRINCIPLES (TPS 3R) IN MANDALAJATI DISTRICT, BANDUNG CITY |
title_sort |
re-design of temporary shelters (tps) into waste processing sites with reduce, reuse, recycle principles (tps 3r) in mandalajati district, bandung city |
url |
https://digilib.itb.ac.id/gdl/view/70363 |
_version_ |
1822006284630622208 |