THE FEASIBILITY STUDY OF ROAD MINE GEOTEXTILE USING DISCOUNTED CASH FLOW METHOD (A CASE STUDY AT PT BERAU COAL)

PT Berau Coal is one of the largest coal company in Indonesia which engaged in the energy sector for coal commodities and contributes to global energy supply. Lati Mine Operation is one of the open pit mining operational owned by PT Berau Coal. This area has overburden removal production annual targ...

Full description

Saved in:
Bibliographic Details
Main Author: Posma Tambunan, Yosua
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/71124
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:71124
spelling id-itb.:711242023-01-27T11:00:49ZTHE FEASIBILITY STUDY OF ROAD MINE GEOTEXTILE USING DISCOUNTED CASH FLOW METHOD (A CASE STUDY AT PT BERAU COAL) Posma Tambunan, Yosua Manajemen umum Indonesia Theses geotextile , cost efficiency , capital budgeting , risk analysis INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/71124 PT Berau Coal is one of the largest coal company in Indonesia which engaged in the energy sector for coal commodities and contributes to global energy supply. Lati Mine Operation is one of the open pit mining operational owned by PT Berau Coal. This area has overburden removal production annual target 134,556,000 BCM and coal getting 8,631,000 MT in year 2022. In the first semester of 2022, actual overburden removal was achieved in 94% under the year to date plan. Based on pareto loss production analysis, the biggest lost contributor of overburden removal was came from hauler productivity parameter. The root cause of hauler productivity problem is material used for road surfacing which has implication to road condition. Road surfacing material was came from redisturb material that cause low bearing capacity on subgrade layer and impacted to road damage on the surface. One of improvement can be done to increase productivity and reduce cost maintenance is investment of geotextile implementation to mine road reinforcement. Therefore, project investment need to be evaluated through a comprehensive financial analysis to get financial feasibility of this project. This research will use capital budgeting analysis to evaluate the financial feasibility, including sensitivity analysis and risk analysis. The baseline of feasibility analysis regarding improvement project shows good result with Net Present Value (NPV) worth IDR 2.128.571.460,46 Internal Rate Return (IRR) of 41,09%, 1,43 of Profitability Index (PI) , and 1,22 years of payback period (PBP). Based on Monte Carlo Simulation, the probability to get IRR below base scenario (< 41,09%) is 13,7%, or in the other words, there is probability 13,7% that the IRR project will generate value below base scenario target calculation in this project. In conclusion, mine road improvement using geotextile is feasible and potentially give optimum impact on increase productivity and cost efficiency regarding to mine road maintenance. For the future research, geotextile improvement financially and technically could be implemented to all mine road PT Berau Coal, in order to that, further studies regarding to material properties in every mine road segments and durability of geotextile itself need to be done. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Posma Tambunan, Yosua
THE FEASIBILITY STUDY OF ROAD MINE GEOTEXTILE USING DISCOUNTED CASH FLOW METHOD (A CASE STUDY AT PT BERAU COAL)
description PT Berau Coal is one of the largest coal company in Indonesia which engaged in the energy sector for coal commodities and contributes to global energy supply. Lati Mine Operation is one of the open pit mining operational owned by PT Berau Coal. This area has overburden removal production annual target 134,556,000 BCM and coal getting 8,631,000 MT in year 2022. In the first semester of 2022, actual overburden removal was achieved in 94% under the year to date plan. Based on pareto loss production analysis, the biggest lost contributor of overburden removal was came from hauler productivity parameter. The root cause of hauler productivity problem is material used for road surfacing which has implication to road condition. Road surfacing material was came from redisturb material that cause low bearing capacity on subgrade layer and impacted to road damage on the surface. One of improvement can be done to increase productivity and reduce cost maintenance is investment of geotextile implementation to mine road reinforcement. Therefore, project investment need to be evaluated through a comprehensive financial analysis to get financial feasibility of this project. This research will use capital budgeting analysis to evaluate the financial feasibility, including sensitivity analysis and risk analysis. The baseline of feasibility analysis regarding improvement project shows good result with Net Present Value (NPV) worth IDR 2.128.571.460,46 Internal Rate Return (IRR) of 41,09%, 1,43 of Profitability Index (PI) , and 1,22 years of payback period (PBP). Based on Monte Carlo Simulation, the probability to get IRR below base scenario (< 41,09%) is 13,7%, or in the other words, there is probability 13,7% that the IRR project will generate value below base scenario target calculation in this project. In conclusion, mine road improvement using geotextile is feasible and potentially give optimum impact on increase productivity and cost efficiency regarding to mine road maintenance. For the future research, geotextile improvement financially and technically could be implemented to all mine road PT Berau Coal, in order to that, further studies regarding to material properties in every mine road segments and durability of geotextile itself need to be done.
format Theses
author Posma Tambunan, Yosua
author_facet Posma Tambunan, Yosua
author_sort Posma Tambunan, Yosua
title THE FEASIBILITY STUDY OF ROAD MINE GEOTEXTILE USING DISCOUNTED CASH FLOW METHOD (A CASE STUDY AT PT BERAU COAL)
title_short THE FEASIBILITY STUDY OF ROAD MINE GEOTEXTILE USING DISCOUNTED CASH FLOW METHOD (A CASE STUDY AT PT BERAU COAL)
title_full THE FEASIBILITY STUDY OF ROAD MINE GEOTEXTILE USING DISCOUNTED CASH FLOW METHOD (A CASE STUDY AT PT BERAU COAL)
title_fullStr THE FEASIBILITY STUDY OF ROAD MINE GEOTEXTILE USING DISCOUNTED CASH FLOW METHOD (A CASE STUDY AT PT BERAU COAL)
title_full_unstemmed THE FEASIBILITY STUDY OF ROAD MINE GEOTEXTILE USING DISCOUNTED CASH FLOW METHOD (A CASE STUDY AT PT BERAU COAL)
title_sort feasibility study of road mine geotextile using discounted cash flow method (a case study at pt berau coal)
url https://digilib.itb.ac.id/gdl/view/71124
_version_ 1822006506122379264