ORGANIC RANKINE CYCLE ANALYSIS ON GEOTHERMAL BASED ELECTRIC POWER PLANT IN TULEHU VILLAGE, MALUKU

The rapid development of technology has an impact on the increasing human need for energy, especially electricity. At present, population growth and climate change are encouraging new interest and investment in renewable energy sources to provide access to reliable and sustainable energy. One of...

Full description

Saved in:
Bibliographic Details
Main Author: Izzatur Rahman Noor, Zakka
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/71274
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:71274
spelling id-itb.:712742023-01-30T11:38:42ZORGANIC RANKINE CYCLE ANALYSIS ON GEOTHERMAL BASED ELECTRIC POWER PLANT IN TULEHU VILLAGE, MALUKU Izzatur Rahman Noor, Zakka Indonesia Final Project ORC, Geothermal, Maluku INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/71274 The rapid development of technology has an impact on the increasing human need for energy, especially electricity. At present, population growth and climate change are encouraging new interest and investment in renewable energy sources to provide access to reliable and sustainable energy. One of the renewable energy sources with huge potential in Indonesia is geothermal. With the advancement of geothermal technology, low-temperature sources can be used as a source of electrical energy by using organic rankine cycle (ORC). The use of lowtemperature geothermal sources can be an electrical energy solution for areas in Indonesia which are located still far from cheap electricity generation. In this research, a geothermal ORC plant study was conducted with a research location in Tulehu, Maluku. The source used is the TLU-01 exploration well with its geothermal fluid characteristics, namely 3 bar pressure, temperature 133.5 ° C, and debit of 238.89 kg / s. The results of this study are the use of a preheater and recuperator can increase the efficiency of the plant, with the highest efficiency obtained is 12.6% and the power generated is around 1800 kW. The highest efficiency plant design uses the R245FA work fluid with a maximum temperature of 133.5 ° C, a maximum pressure of 9 bar, a minimum pressure of 1.85 bar, and a mass flow rate of the working fluid of 65.5 kg / s. The cost of generation using the system is Rp. 1093.94, or 64% lower than the BPP of Ambon city in Maluku. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The rapid development of technology has an impact on the increasing human need for energy, especially electricity. At present, population growth and climate change are encouraging new interest and investment in renewable energy sources to provide access to reliable and sustainable energy. One of the renewable energy sources with huge potential in Indonesia is geothermal. With the advancement of geothermal technology, low-temperature sources can be used as a source of electrical energy by using organic rankine cycle (ORC). The use of lowtemperature geothermal sources can be an electrical energy solution for areas in Indonesia which are located still far from cheap electricity generation. In this research, a geothermal ORC plant study was conducted with a research location in Tulehu, Maluku. The source used is the TLU-01 exploration well with its geothermal fluid characteristics, namely 3 bar pressure, temperature 133.5 ° C, and debit of 238.89 kg / s. The results of this study are the use of a preheater and recuperator can increase the efficiency of the plant, with the highest efficiency obtained is 12.6% and the power generated is around 1800 kW. The highest efficiency plant design uses the R245FA work fluid with a maximum temperature of 133.5 ° C, a maximum pressure of 9 bar, a minimum pressure of 1.85 bar, and a mass flow rate of the working fluid of 65.5 kg / s. The cost of generation using the system is Rp. 1093.94, or 64% lower than the BPP of Ambon city in Maluku.
format Final Project
author Izzatur Rahman Noor, Zakka
spellingShingle Izzatur Rahman Noor, Zakka
ORGANIC RANKINE CYCLE ANALYSIS ON GEOTHERMAL BASED ELECTRIC POWER PLANT IN TULEHU VILLAGE, MALUKU
author_facet Izzatur Rahman Noor, Zakka
author_sort Izzatur Rahman Noor, Zakka
title ORGANIC RANKINE CYCLE ANALYSIS ON GEOTHERMAL BASED ELECTRIC POWER PLANT IN TULEHU VILLAGE, MALUKU
title_short ORGANIC RANKINE CYCLE ANALYSIS ON GEOTHERMAL BASED ELECTRIC POWER PLANT IN TULEHU VILLAGE, MALUKU
title_full ORGANIC RANKINE CYCLE ANALYSIS ON GEOTHERMAL BASED ELECTRIC POWER PLANT IN TULEHU VILLAGE, MALUKU
title_fullStr ORGANIC RANKINE CYCLE ANALYSIS ON GEOTHERMAL BASED ELECTRIC POWER PLANT IN TULEHU VILLAGE, MALUKU
title_full_unstemmed ORGANIC RANKINE CYCLE ANALYSIS ON GEOTHERMAL BASED ELECTRIC POWER PLANT IN TULEHU VILLAGE, MALUKU
title_sort organic rankine cycle analysis on geothermal based electric power plant in tulehu village, maluku
url https://digilib.itb.ac.id/gdl/view/71274
_version_ 1822006547009503232