OPERATIONAL TIME & COST IMPROVEMENT FOR ROUTINE SERVICE JOB AT RIG GBT-09 BY USING LEAN SIX SIGMA FRAMEWORK AT BLUE OIL COMPANY
Blue Oil Company (BOC) is well-known for its large crude oil production in Indonesia. Facing the upcoming end of contract with Indonesian government, BOC keeps trying to maintain its production level. The condition challenges D&C (Drilling & Completion) Rig Hub team to optimize routine se...
Saved in:
Main Author: | Sintong O Tampubolon, Arnold |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/71329 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
WELL WORKOVER PROGRAM DEVELOPMENT PROCESS IMPROVEMENT BY USING LEAN SIX SIGMA FRAMEWORK AT SUMATERA OIL COMPANY
by: Arianto Tampubolon, Daniel -
PRODUCTION CAPACITY IMPROVEMENT USING LEAN SIX SIGMA AT PT. EXCELITAS TECHNOLOGIES BATAM
by: Ananda Nopri Andi, Putra -
PROCESS IMPROVEMENT ON WORKOVER RIG CONTRACT TRANSITION TO ELIMINATE DELAY DELIVERY OF NEW-ENTRANT CONTRACTOR BY USING LEAN SIGMA METHOD
by: Arliyando, Lamdamatra -
IMPROVING WELL SERVICE CYCLE TIME IN RIG HUB WELLS DEPARTMENT THROUGH LEAN SIGMA METHODOLOGY (A CASE STUDY OF PT. BELVIS)
by: Wibowo, Kristanto -
INCREASING PRODUCTION CAPACITY OF RACK STEERING LINE AT PT.ABC USING LEAN SIX SIGMA METHODOLOGY
by: Harasta Fadruzil, Farhan