ANALYSIS OF TRANSIENT RECOVERY VOLTAGE ON SURALAYA-SURALAYA BARU 500 KV TRANSMISSION LINE DUE TO ADDITIONAL SERIES REACTORS
The higher growth of electricity generation and power grids will impact the increase in short-circuit currents. In large systems such as Java-Madura-Bali, the short circuit problem is a concern because it can damage electrical equipment if it exceeds the short circuit current withstand of the equipm...
Saved in:
主要作者: | Mayla Sari, Ika |
---|---|
格式: | Theses |
語言: | Indonesia |
主題: | |
在線閱讀: | https://digilib.itb.ac.id/gdl/view/71422 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | Institut Teknologi Bandung |
語言: | Indonesia |
相似書籍
-
STUDI ESTIMASI LAJU KEGAGALAN PENYALURAN DAYA AKIBAT FLASHOVER PADA SALURAN TRANSMISI TEGANGAN TINGGI EKSTRA. (KASUS: SALURAN TRAUSMISI 500 KV SURALAYA - GANDUL)
由: Sabar Nainggolan , Werlin -
HAMMERING PHENOMENA ANALYSIS OF HIGH PRESSURE SYSTEM BYPASS UNIT 1-4 SURALAYA STEAM POWER PLANT
由: Johanes, Darwin -
SITE SPECIFIC RESPONSE SPECTRA ANALYSIS FOR SURALAYA REGION
由: (NIM 25006013), DELFEBRIYADI -
Study the phenomenon of slagging and fouling Low Rank Coal (LRC) at boiler Unit 1-4 Suralaya Steam Power Plant by Computational Fluid Dynamic (CFD) modeling
由: Hanafi Nur Rifa'i, Moch -
INFLUENCE OF USING LOW RANK COAL DUE TO BOILER EFFICIENCY OF SURALAYA COAL FIRED POWER PLANT UNIT 3
由: TRI F (NIM : 23108326); Tim Pembimbing : Dr. Ir. Toto Hardianto; Prof. Dr. Ir. Aryadi Suwon, ANDIEK