TECHNICAL FEASIBILITY ANALYSIS OF THE 500 KV EXTRA HIGH VOLTAGE OVERHEAD TRANSMISSION SYSTEM PROJECT IN SUMATRA

Abstract—The 500 kV Extra High Voltage Transmission Line project in Sumatra is a critical infrastructure initiative designed to improve the efficiency and reliability of power transmission across the Sumatra island. This study evaluates the technical feasibility of the project by analyzing key aspec...

Full description

Saved in:
Bibliographic Details
Main Author: Dharma Putra, Trisno
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/87610
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia