TECHNICAL FEASIBILITY ANALYSIS OF THE 500 KV EXTRA HIGH VOLTAGE OVERHEAD TRANSMISSION SYSTEM PROJECT IN SUMATRA
Abstract—The 500 kV Extra High Voltage Transmission Line project in Sumatra is a critical infrastructure initiative designed to improve the efficiency and reliability of power transmission across the Sumatra island. This study evaluates the technical feasibility of the project by analyzing key aspec...
Saved in:
Main Author: | Dharma Putra, Trisno |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/87610 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
LIGHTNING PROTECTION SYSTEM ON OVERHEADLINE AND SUBSTATION EXTRA HIGH VOLTAGE 500 KV SUMATERA
by: Irsal, Abdurrauf -
Evaluation Of Lightning Performance 500 kV Extra High Voltage Transmission And Determination Of Critical Spots By Using Severity Index Method (Case Study on Paiton-Kediri 500 kV EHV Transmission)
by: YUDO PRAMONO (NIM 23205024), EKO -
LIGHTNING PERFORMANCE ANALYSIS OF EXTRA HIGH VOLTAGE 500 KV 2 CIRCUITS AND 4 CIRCUITS
by: JUNAIDI (NIM : 23214099), ANDI -
STUDY OF LIGHTNING PROTECTION SYSTEM IMPROVEMENT ON EXTRA HIGH VOLTAGE 500 KV TRANSMISSION LINES IN TROPICAL AREA USING EXTENDED MAST TERMINAL
by: LEO, TULUS -
LINE LIGHTNING PROTECTION DEVICE ANALYSIS FOR 70 KV HIGH VOLTAGE OVERHEAD LINE IN MALANG
by: Fitria Cahya, Vanny