TECHNICAL FEASIBILITY ANALYSIS OF THE 500 KV EXTRA HIGH VOLTAGE OVERHEAD TRANSMISSION SYSTEM PROJECT IN SUMATRA
Abstract—The 500 kV Extra High Voltage Transmission Line project in Sumatra is a critical infrastructure initiative designed to improve the efficiency and reliability of power transmission across the Sumatra island. This study evaluates the technical feasibility of the project by analyzing key aspec...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/87610 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!