STUDY OF THE IMPLEMENTATION OF INLETCONSTRUCTION AND METHODS OF OPERATION ANDMAINTENANCE IN CILIWUNG RIVER - EAST FLOOD CANAL(KBT) FLOOD DIVERSION TUNNEL
The Ciliwung River with springs from Mount Parangro has a length of 109 km and a watershed area of 347 km2 passing through Bogor, Depok and ends in the north coast of DKI Jakarta. Every year during the rainy season several sections of the Ciliwung River, especially the Cawang-Manggarai Water Gate se...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/71463 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |