MINIMIZING RENOVATION PROJECT DELAYS(CASE STUDY: PT PERTAMINA RETAIL)

PT Pertamina Retail is a PT Pertamina Niaga subsidiary which has responsible for operating COCO gas stations owned by PT Pertamina (Persero). Currently, PT Pertamina's competitors are increasingly developing their business and increasing their outlets, which will become a challenge for PT Pe...

Full description

Saved in:
Bibliographic Details
Main Author: Khaerunnisa, Soraya
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/71997
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:71997
spelling id-itb.:719972023-03-01T13:26:22ZMINIMIZING RENOVATION PROJECT DELAYS(CASE STUDY: PT PERTAMINA RETAIL) Khaerunnisa, Soraya Manajemen umum Indonesia Theses Renovation Project, Project Delays, PMBOK, Project Schedule Management, Project Cost Management, AHP INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/71997 PT Pertamina Retail is a PT Pertamina Niaga subsidiary which has responsible for operating COCO gas stations owned by PT Pertamina (Persero). Currently, PT Pertamina's competitors are increasingly developing their business and increasing their outlets, which will become a challenge for PT Pertamina Retail. So, PT Pertamina Retail is constantly upgrading and improving the appearance of fuel station facilities, ensuring that the facilities has an optimal function. This is also stated in the company's strategy and listed in the 5R program (Ringkas (Brief), Rapi (Neat), Resik (Clean), Rawat (Caring), Rajin (Diligent)). To accommodate the above strategy, PT Pertamina Retail also allocates a capital goods investment to implement repairs/renovations in the existing Fuel Station. The project’s progress performance gap caused PT Pertamina Retail to not achieve the Key Performance Indicator according to the target, particularly the Non-Business Development Capital Goods Investment. The purpose of this study is to find the root causes to minimize project delays and find solutions to solve these problems so that the project can be completed on time and the KPI for Non-Business Development Capital Goods Investment is achieved. To identify problems, research was conducted at a gas station in the Jabodetabek area with specific criteria. Interview methods will be conducted with stakeholders who play a role in the gas station renovation project. The current reality tree method will analyze problem identification to get the root cause. Case Study and Literature reviews will be conducted to find a theory to resolve the root cause. PMBOK, especially in the project schedule management and planning process group sections, and Operation Management theory, especially Lean Production, will be used to analyze the project's performance and find a solution. Several alternative solutions will be identified based on the root cause obtained. Then the best alternative solutions will be selected by using AHP (Analytical Hierarchy Process) with the criteria and rating of the results of questionnaire that sent to the stakeholders. Then, implementation plan for the best alternative solution will be designed and use as a recommendation for the company. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Khaerunnisa, Soraya
MINIMIZING RENOVATION PROJECT DELAYS(CASE STUDY: PT PERTAMINA RETAIL)
description PT Pertamina Retail is a PT Pertamina Niaga subsidiary which has responsible for operating COCO gas stations owned by PT Pertamina (Persero). Currently, PT Pertamina's competitors are increasingly developing their business and increasing their outlets, which will become a challenge for PT Pertamina Retail. So, PT Pertamina Retail is constantly upgrading and improving the appearance of fuel station facilities, ensuring that the facilities has an optimal function. This is also stated in the company's strategy and listed in the 5R program (Ringkas (Brief), Rapi (Neat), Resik (Clean), Rawat (Caring), Rajin (Diligent)). To accommodate the above strategy, PT Pertamina Retail also allocates a capital goods investment to implement repairs/renovations in the existing Fuel Station. The project’s progress performance gap caused PT Pertamina Retail to not achieve the Key Performance Indicator according to the target, particularly the Non-Business Development Capital Goods Investment. The purpose of this study is to find the root causes to minimize project delays and find solutions to solve these problems so that the project can be completed on time and the KPI for Non-Business Development Capital Goods Investment is achieved. To identify problems, research was conducted at a gas station in the Jabodetabek area with specific criteria. Interview methods will be conducted with stakeholders who play a role in the gas station renovation project. The current reality tree method will analyze problem identification to get the root cause. Case Study and Literature reviews will be conducted to find a theory to resolve the root cause. PMBOK, especially in the project schedule management and planning process group sections, and Operation Management theory, especially Lean Production, will be used to analyze the project's performance and find a solution. Several alternative solutions will be identified based on the root cause obtained. Then the best alternative solutions will be selected by using AHP (Analytical Hierarchy Process) with the criteria and rating of the results of questionnaire that sent to the stakeholders. Then, implementation plan for the best alternative solution will be designed and use as a recommendation for the company.
format Theses
author Khaerunnisa, Soraya
author_facet Khaerunnisa, Soraya
author_sort Khaerunnisa, Soraya
title MINIMIZING RENOVATION PROJECT DELAYS(CASE STUDY: PT PERTAMINA RETAIL)
title_short MINIMIZING RENOVATION PROJECT DELAYS(CASE STUDY: PT PERTAMINA RETAIL)
title_full MINIMIZING RENOVATION PROJECT DELAYS(CASE STUDY: PT PERTAMINA RETAIL)
title_fullStr MINIMIZING RENOVATION PROJECT DELAYS(CASE STUDY: PT PERTAMINA RETAIL)
title_full_unstemmed MINIMIZING RENOVATION PROJECT DELAYS(CASE STUDY: PT PERTAMINA RETAIL)
title_sort minimizing renovation project delays(case study: pt pertamina retail)
url https://digilib.itb.ac.id/gdl/view/71997
_version_ 1822006736107601920