FEASIBILITY STUDY FOR TUGBOAT EXPANSION PROJECT USING CAPITAL BUDGETING AND SENSITIVITY ANALYSIS (CASE STUDY: PT. BIRU ORANGE )
The Covid-19 pandemic and the unstable geopolitical environment has highly disrupted the global economy. The turn of events affected businesses sectors differently, due the disruption of the supply chain many industries have to suffer. However, there are sectors that performed well in a very uncerta...
Saved in:
Main Author: | Dwibastyantoro, Bisma |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/72023 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
INVESTMENT VALUATION OF TUGBOAT AND BARGE USING CAPITAL BUDGETING AND FREIGHT RATE SENSITIVITY ANALYSIS (CASE STUDY: PT ANGKUT)
by: YUVITA (NIM 29316309), ALMIRA -
TUGBOAT FLEET PLANNING AND SCHEDULING
by: WEI XIAOYANG
Published: (2022) -
A feasibility study on the expansion of machineries & equipment using capital budgeting techniques for Dataman Systems Corporation for the year 2000-2004.
by: Pe, Sheelah Marie.
Published: (1999) -
Dynamic Tugboat Scheduling for Container Ports
by: Xiaoyang Wei, et al.
Published: (2023) -
ASSESSMENT HAZARD FOR TUGBOAT OPERATION IN INDONESIAN WATERS
by: IMAN MALAKANI (nim : NIM. 12914002), ARDI