WATER RESOURCE ASPECT DESIGN OF ARTHA GADING POLDER SYSTEM

Flood is one of the problems that often occurs in the Special Capital Region of Jakarta. One method that can be uses to deal with the flooding problem is polder system. In this study, a polder system plan will be made with the study area in the Artha Gading area. The Artha Gading polder system is...

Full description

Saved in:
Bibliographic Details
Main Author: Muhammad Juang Lahati, Sandy
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/72080
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:Flood is one of the problems that often occurs in the Special Capital Region of Jakarta. One method that can be uses to deal with the flooding problem is polder system. In this study, a polder system plan will be made with the study area in the Artha Gading area. The Artha Gading polder system is designed with a catchment area of 2.6 km². The design of the polder system includes one detention pond with a capacity of 15,000 m², 3 pumps with a capacity of 5 m³/s, 4 sluice gates, and an elevation of the drainage embankment within the polder system. The construction of this polder system can reduce flood water level so that no flooding occurs in the Artha Gading area. The budget plan for building the Artha Gading polder system is Rp. 77,605,640,879.