SIMULATING THE LOGISTIC PROCESS REDESIGN OF MATERIAL PLANNING IN UPSTREAM OIL AND GAS INDUSTRIES CASE STUDY IN HUSKY CNOOC MADURA LIMITED 2016
This research will examine the logistic process that usually applied by the upstream oil and gas company by looking inside the Husky CNOOC Madura Limited (HCML) and how the problem of huge amount of excess material and dead material may happen when the company planned the material that will be neede...
Saved in:
Main Author: | Ramos Bobby, Caesar |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/72262 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PROJECT DELAY ANALYSIS IN HUSKY CNOOC MADURA LIMITED
by: YAMES DENIANTARA / 29115071, ADRIZA -
DECISION MAKING ANALYSIS IN SELECTING LOGISTICS OPERATION LOCATION TO SUPPORT MULTI PRODUCTION FIELDS IN UPSTREAM OIL & GAS OPERATION USING ANALYTICAL HIERARCHY PROCESS (AHP): A CASE STUDY OF HUSKY-CNOOC MADURA LIMITED
by: Fairuz, Ahmad -
EXPLORING THE FEASIBILITY OF CARBON CAPTURE, STORAGE (CCS) INTEGRATION IN OFFSHORE OIL AND GAS OPERATIONS: A QUALITATIVE ANALYSIS OF HUSKY-CNOOC MADURA LIMITED (HCML)
by: Mukhlis Sanggomaro, Ilmam -
THE FUTURE OF INDONESIAN UPSTREAM OIL AND GAS INDUSTRY 2045 USING TRANSFORMATIVE SCENARIO PLANNING APPROACH
by: Kharisma Suko, Barkun -
INSPECTION PLANNING ON OIL AND GAS UPSTREAM FACILITYâS EQUIPMENT BASED ON DAMAGE MECHANISM AND REMAINING LIFE CASE STUDY: UPSTREAM FACILITY SANTAN FIELD
by: Ben Loda, Kevin