#TITLE_ALTERNATIVE#

Optimization is process turn out something more effective/complete, with proper adjustment for input. If optimization is process, then output of pit optimization is defined as pit effectively finished within highest profit (profit = revenue – cost). Mine planning can be explained with creatin...

Full description

Saved in:
Bibliographic Details
Main Author: RIKY (NIM 12103042), ANTON
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/7249
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:7249
spelling id-itb.:72492017-09-27T10:39:02Z#TITLE_ALTERNATIVE# RIKY (NIM 12103042), ANTON Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/7249 Optimization is process turn out something more effective/complete, with proper adjustment for input. If optimization is process, then output of pit optimization is defined as pit effectively finished within highest profit (profit = revenue – cost). Mine planning can be explained with creating mine design that reach ultimate pit limit in a certain periode wit h benefit and safely. Inside also ultimate pit design, pushback, mine sequencing, production scheduling, etc (related with geometry). Another aspects include calculation of equipment and workers, operating and capital cost estimate. Mine Planning has aim in order to mine production planning for ore deposit that will deliver cash flow with maximizing economic criterion (NPV/ROR) at lower cost and fixed production capacity. This research has purpose to get optimal pit and knowing impact of revenue changes. For that, this final assignment using two software which NPV Scheduler and simple program (runs on fortran). This assignment will doing simulation of pit optimal, simulation of revenue changes eather decreasing or increasing revenue. The final assignment will be divided into two main parts. First, generates optimal pit (running NPV Scheduler fully), and for next work divide simulation into three scenarios (NPV Scheduler) and five scenarios (simple program) for simulation of revenue changes. The result of this research showing that pit optimization can generating optimal pit (especially economics view). Another result, showing the impact of revenue changes (especially decresing revenue) with consequently major changes in mine. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Optimization is process turn out something more effective/complete, with proper adjustment for input. If optimization is process, then output of pit optimization is defined as pit effectively finished within highest profit (profit = revenue – cost). Mine planning can be explained with creating mine design that reach ultimate pit limit in a certain periode wit h benefit and safely. Inside also ultimate pit design, pushback, mine sequencing, production scheduling, etc (related with geometry). Another aspects include calculation of equipment and workers, operating and capital cost estimate. Mine Planning has aim in order to mine production planning for ore deposit that will deliver cash flow with maximizing economic criterion (NPV/ROR) at lower cost and fixed production capacity. This research has purpose to get optimal pit and knowing impact of revenue changes. For that, this final assignment using two software which NPV Scheduler and simple program (runs on fortran). This assignment will doing simulation of pit optimal, simulation of revenue changes eather decreasing or increasing revenue. The final assignment will be divided into two main parts. First, generates optimal pit (running NPV Scheduler fully), and for next work divide simulation into three scenarios (NPV Scheduler) and five scenarios (simple program) for simulation of revenue changes. The result of this research showing that pit optimization can generating optimal pit (especially economics view). Another result, showing the impact of revenue changes (especially decresing revenue) with consequently major changes in mine.
format Final Project
author RIKY (NIM 12103042), ANTON
spellingShingle RIKY (NIM 12103042), ANTON
#TITLE_ALTERNATIVE#
author_facet RIKY (NIM 12103042), ANTON
author_sort RIKY (NIM 12103042), ANTON
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/7249
_version_ 1820664097607254016