ESTIMASI SUMBERDAYA BATUGAMPING DALAM KERANGKA SABUK FASIES KAJIAN DI DAERAH PAMUBULAN PROVINSI BANTEN

Research on estimation of limestone resources is heavily concentrated on geostatistical analysis. The entire limestone body is estimated using a certain estimation method and it is expected that grade prediction can be carried out well. However, the limestone body is not a homogeneous edifice, th...

Full description

Saved in:
Bibliographic Details
Main Author: Nur Taufiqurrahman, Ahmad
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/72536
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items