DETERMINATION OF RAW MATERIAL PURCHASING FREQUENCY AND SCHEDULE CONSIDERING FLUCTUATING FOREIGN EXCHANGE RATE, CONTRACTED PRICE, AND DELIVERY LEAD TIME
This research presents problem on determination of optimal raw material purchasing frequency and schedule considering fluctuating foreign exchange rate, contracted price, and delivery lead time. This problem happens in companies in Indonesia which make transactions with different currency, and ha...
Saved in:
Main Author: | Britania, Rizka |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/72573 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
FOREIGN EXCHANGE RISKS IN CONSTRUCTION CONTRACTS
by: HO WAI CHEE
Published: (2020) -
FOREIGN EXCHANGE RISKS IN CONSTRUCTION CONTRACTS
by: TAN YEOW CHONG
Published: (2020) -
STRATEGIES IN DEALING WITH MATERIAL PRICE FLUCTUATIONS IN FIXED PRICE CONTRACTS
by: LIM WEN TING
Published: (2024) -
OPTIMAL SCHEDULING ALGORITHM FOR COAL-POWERED POWER PLANTS â CONSIDERING COAL DELIVERY CONSTRAINTS
by: Adjie Brotosukmono, Harso -
THE IINVENTORY POLICY OF DRUG RAW MATERIALS WITH CONSIDERING SHELF LIFE
by: AKBAR NIM 13414097, MOCHAMMAD