LEAN BUSINESS PROCESS FOR WASTE REDUCTION AT ORDER FULFILLMENT CASE STUDY AT PT MULYO DITO PANGESTU

In the era of digital and the pressures from the competitive market, the supply chain system used for quickly respond to the requirements of the customer by shortening the operation time for each process. The lean thinking was invented in order to eliminate the wastes and increasing more value to th...

Full description

Saved in:
Bibliographic Details
Main Author: Kusnaman, Tobias
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/72584
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:72584
spelling id-itb.:725842023-04-18T14:20:29ZLEAN BUSINESS PROCESS FOR WASTE REDUCTION AT ORDER FULFILLMENT CASE STUDY AT PT MULYO DITO PANGESTU Kusnaman, Tobias Indonesia Final Project Lean principles, Business process mapping, Direct selling INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/72584 In the era of digital and the pressures from the competitive market, the supply chain system used for quickly respond to the requirements of the customer by shortening the operation time for each process. The lean thinking was invented in order to eliminate the wastes and increasing more value to the customers. The topic of this final project originates from MDP company that has a role as one of the Authorized Distributor Tupperware in Indonesia. This final project is an attempt to understand, analyze the problems, and give the solutions for order fulfillment flow on the promotional product that changes every month. Data collected through interviews with MDP management, observations at the office and group in a communication system, have been collected as the input for constructed the value stream mapping. The value stream mapping method has been applied to construct the current state map of the Order Fulfillment value stream and identify the wastes. In addition, other methods including the SIPOC and current reality tree, have been applied to analyze the company relationships with the business partners and developed the root cause problem. It has been concluded from the current state map of promotion product order fulfillment that there are several wastes comprised of waiting, overprocessing, partially completed work, and unused employee potential. Solutions have been proposed to better integration between the key actors to reduce the time waste for the coordination. Using the internet link in order to collect the demand from the customers has been found bring more advantages rather than on social media’s group. For the receiving process, the employees should work simultaneously on the first floor and on the third floor because the bottleneck of the process is when moving the goods through the elevator. The measurement to reduce wastes have been summarized in the draft of the future state map. The processing time reduced from 450 minutes to 308 minutes and the waiting time decreased from 4 days to 2 days. By implementing the new design, the gap of the target from the sales revenue in 2016 will decrease 36%, the amount of Rp 496,000,000. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description In the era of digital and the pressures from the competitive market, the supply chain system used for quickly respond to the requirements of the customer by shortening the operation time for each process. The lean thinking was invented in order to eliminate the wastes and increasing more value to the customers. The topic of this final project originates from MDP company that has a role as one of the Authorized Distributor Tupperware in Indonesia. This final project is an attempt to understand, analyze the problems, and give the solutions for order fulfillment flow on the promotional product that changes every month. Data collected through interviews with MDP management, observations at the office and group in a communication system, have been collected as the input for constructed the value stream mapping. The value stream mapping method has been applied to construct the current state map of the Order Fulfillment value stream and identify the wastes. In addition, other methods including the SIPOC and current reality tree, have been applied to analyze the company relationships with the business partners and developed the root cause problem. It has been concluded from the current state map of promotion product order fulfillment that there are several wastes comprised of waiting, overprocessing, partially completed work, and unused employee potential. Solutions have been proposed to better integration between the key actors to reduce the time waste for the coordination. Using the internet link in order to collect the demand from the customers has been found bring more advantages rather than on social media’s group. For the receiving process, the employees should work simultaneously on the first floor and on the third floor because the bottleneck of the process is when moving the goods through the elevator. The measurement to reduce wastes have been summarized in the draft of the future state map. The processing time reduced from 450 minutes to 308 minutes and the waiting time decreased from 4 days to 2 days. By implementing the new design, the gap of the target from the sales revenue in 2016 will decrease 36%, the amount of Rp 496,000,000.
format Final Project
author Kusnaman, Tobias
spellingShingle Kusnaman, Tobias
LEAN BUSINESS PROCESS FOR WASTE REDUCTION AT ORDER FULFILLMENT CASE STUDY AT PT MULYO DITO PANGESTU
author_facet Kusnaman, Tobias
author_sort Kusnaman, Tobias
title LEAN BUSINESS PROCESS FOR WASTE REDUCTION AT ORDER FULFILLMENT CASE STUDY AT PT MULYO DITO PANGESTU
title_short LEAN BUSINESS PROCESS FOR WASTE REDUCTION AT ORDER FULFILLMENT CASE STUDY AT PT MULYO DITO PANGESTU
title_full LEAN BUSINESS PROCESS FOR WASTE REDUCTION AT ORDER FULFILLMENT CASE STUDY AT PT MULYO DITO PANGESTU
title_fullStr LEAN BUSINESS PROCESS FOR WASTE REDUCTION AT ORDER FULFILLMENT CASE STUDY AT PT MULYO DITO PANGESTU
title_full_unstemmed LEAN BUSINESS PROCESS FOR WASTE REDUCTION AT ORDER FULFILLMENT CASE STUDY AT PT MULYO DITO PANGESTU
title_sort lean business process for waste reduction at order fulfillment case study at pt mulyo dito pangestu
url https://digilib.itb.ac.id/gdl/view/72584
_version_ 1822006882185773056