OPTIMIZATION OF DIMETHYL ETER (DME) SUPPLY CHAIN DAILY OPERATIONS IN SUMATRA WITH RAIL TANK WAGONS AND VESSELS USING MIXED INTEGER LINEAR PROGRAMMING

Indonesia import of LPG is currently up to 80% of its demand. To reduce its import dependency, PT X as the existing LPG distributor has made an agreement between PT Y as the producer and PT Z as the investor to produce DME in Tanjung Enim, South Sumatra, which serves as the substitute of LPG. PT X i...

Full description

Saved in:
Bibliographic Details
Main Author: Towinsen, Rycki
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/72674
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia