POTENTIAL OF APPLICATION GORLOV TURBINE IN RIVER

Marine current power plant was develop very fast. but cost of construction and power transmission still expensive and not suitable for remote area. This thesis concern to application marine current power plant as water flow power plant for river in Bandung area. do study for choosing suit marine...

Full description

Saved in:
Bibliographic Details
Main Author: Wahyudi, Andri
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/72762
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:72762
spelling id-itb.:727622023-05-26T12:57:01ZPOTENTIAL OF APPLICATION GORLOV TURBINE IN RIVER Wahyudi, Andri Indonesia Final Project Gorlov turbine, river debit INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/72762 Marine current power plant was develop very fast. but cost of construction and power transmission still expensive and not suitable for remote area. This thesis concern to application marine current power plant as water flow power plant for river in Bandung area. do study for choosing suit marine current power plant, thus choose gorlov turbine with 35 % effisiensi and TSR 2-2.2 The suit river for application marrine current power plant as water flow power plant for river in bandung area are citarum dayeuh kolot river that has 1035 ???????????? drift has power potention 93.61 kW and citarum nanjung river that has 1035 ???????????? drift has power potention 93.61 kW. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Marine current power plant was develop very fast. but cost of construction and power transmission still expensive and not suitable for remote area. This thesis concern to application marine current power plant as water flow power plant for river in Bandung area. do study for choosing suit marine current power plant, thus choose gorlov turbine with 35 % effisiensi and TSR 2-2.2 The suit river for application marrine current power plant as water flow power plant for river in bandung area are citarum dayeuh kolot river that has 1035 ???????????? drift has power potention 93.61 kW and citarum nanjung river that has 1035 ???????????? drift has power potention 93.61 kW.
format Final Project
author Wahyudi, Andri
spellingShingle Wahyudi, Andri
POTENTIAL OF APPLICATION GORLOV TURBINE IN RIVER
author_facet Wahyudi, Andri
author_sort Wahyudi, Andri
title POTENTIAL OF APPLICATION GORLOV TURBINE IN RIVER
title_short POTENTIAL OF APPLICATION GORLOV TURBINE IN RIVER
title_full POTENTIAL OF APPLICATION GORLOV TURBINE IN RIVER
title_fullStr POTENTIAL OF APPLICATION GORLOV TURBINE IN RIVER
title_full_unstemmed POTENTIAL OF APPLICATION GORLOV TURBINE IN RIVER
title_sort potential of application gorlov turbine in river
url https://digilib.itb.ac.id/gdl/view/72762
_version_ 1822992702591991808