FINANCIAL FEASIBILITY STUDY OF ENVIRONMENTAL LABORATORY ESTABLISHMENT AT XYZ FOUNDATION
XYZ Foundation, a non-profit organization established in 2008 by a major heavy equipment distributor in Indonesia, aims to support corporate social responsibility programs. The foundation plans to establish an accredited environmental laboratory to address environmental concerns and generate additio...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/72899 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:72899 |
---|---|
spelling |
id-itb.:728992023-06-07T14:17:08ZFINANCIAL FEASIBILITY STUDY OF ENVIRONMENTAL LABORATORY ESTABLISHMENT AT XYZ FOUNDATION Putri Endru Subekti, Zahra Indonesia Final Project Environmental Laboratory, Financial Feasibility Study, Capital Budgeting, NPV, Risk Analysis. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/72899 XYZ Foundation, a non-profit organization established in 2008 by a major heavy equipment distributor in Indonesia, aims to support corporate social responsibility programs. The foundation plans to establish an accredited environmental laboratory to address environmental concerns and generate additional revenue. The project costs IDR10 billion which is a significant amount for the foundation. The foundation wants to discover the feasibility of this project and its risk. To assess the project's financial feasibility and risks, the study uses primary data from interviews, as well as secondary data such as historical and benchmark data. The data analysis involves six stages. Pro forma financial statements are constructed based on assumptions, and Free Cash Flow to the Firm (FCFF) is calculated. The Weighted Average Cost of Capital (WACC) is also determined for the financial feasibility study. Capital budgeting techniques, including NPV, IRR, PI, payback period, and discounted payback period, are employed to evaluate the project's feasibility. If the project is deemed feasible, the next stage assesses its risks. Alternative strategies are proposed by modifying various variables if it is considered unfeasible. In this study, the actual strategy proposed by the foundation is deemed. Therefore, a proposed strategy is introduced, considering factors such as production capacity and the high Cost of Service Provided (COSP). The proposed strategy demonstrates feasibility based on the capital budgeting techniques' results. However, it also presents considerable risk, as indicated by the Monte Carlo Simulation. Mitigation strategies are necessary to address the associated risks. Overall, the study concludes that the foundation should adopt the proposed strategy due to its feasibility and considers risk mitigation measures. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
XYZ Foundation, a non-profit organization established in 2008 by a major heavy equipment distributor in Indonesia, aims to support corporate social responsibility programs. The foundation plans to establish an accredited environmental laboratory to address environmental concerns and generate additional revenue. The project costs IDR10 billion which is a significant amount for the foundation. The foundation wants to discover the feasibility of this project and its risk. To assess the project's financial feasibility and risks, the study uses primary data from interviews, as well as secondary data such as historical and benchmark data. The data analysis involves six stages. Pro forma financial statements are constructed based on assumptions, and Free Cash Flow to the Firm (FCFF) is calculated. The Weighted Average Cost of Capital (WACC) is also determined for the financial feasibility study. Capital budgeting techniques, including NPV, IRR, PI, payback period, and discounted payback period, are employed to evaluate the project's feasibility. If the project is deemed feasible, the next stage assesses its risks. Alternative strategies are proposed by modifying various variables if it is considered unfeasible.
In this study, the actual strategy proposed by the foundation is deemed. Therefore, a proposed strategy is introduced, considering factors such as production capacity and the high Cost of Service Provided (COSP). The proposed strategy demonstrates feasibility based on the capital budgeting techniques' results. However, it also presents considerable risk, as indicated by the Monte Carlo Simulation. Mitigation strategies are necessary to address the associated risks. Overall, the study concludes that the foundation should adopt the proposed strategy due to its feasibility and considers risk mitigation measures. |
format |
Final Project |
author |
Putri Endru Subekti, Zahra |
spellingShingle |
Putri Endru Subekti, Zahra FINANCIAL FEASIBILITY STUDY OF ENVIRONMENTAL LABORATORY ESTABLISHMENT AT XYZ FOUNDATION |
author_facet |
Putri Endru Subekti, Zahra |
author_sort |
Putri Endru Subekti, Zahra |
title |
FINANCIAL FEASIBILITY STUDY OF ENVIRONMENTAL LABORATORY ESTABLISHMENT AT XYZ FOUNDATION |
title_short |
FINANCIAL FEASIBILITY STUDY OF ENVIRONMENTAL LABORATORY ESTABLISHMENT AT XYZ FOUNDATION |
title_full |
FINANCIAL FEASIBILITY STUDY OF ENVIRONMENTAL LABORATORY ESTABLISHMENT AT XYZ FOUNDATION |
title_fullStr |
FINANCIAL FEASIBILITY STUDY OF ENVIRONMENTAL LABORATORY ESTABLISHMENT AT XYZ FOUNDATION |
title_full_unstemmed |
FINANCIAL FEASIBILITY STUDY OF ENVIRONMENTAL LABORATORY ESTABLISHMENT AT XYZ FOUNDATION |
title_sort |
financial feasibility study of environmental laboratory establishment at xyz foundation |
url |
https://digilib.itb.ac.id/gdl/view/72899 |
_version_ |
1822006952330264576 |