COMPARISON BETWEEN ADAPTIVE AND FIXED TIME MODES OF SCATS OPERATION ALONG CIPAGANTI CORRIDOR IN BANDUNG
ABSTRACT: <br /> <br /> <br /> This study compares the performance of existing adaptive mode of SCATS (Sydney Coordinated Adaptive Traffic System) operation with that of a fixed time coordination mode. The main objectives of the study are: 1) to set up a comparable fixed time coor...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/7339 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:7339 |
---|---|
spelling |
id-itb.:73392017-09-27T15:21:02ZCOMPARISON BETWEEN ADAPTIVE AND FIXED TIME MODES OF SCATS OPERATION ALONG CIPAGANTI CORRIDOR IN BANDUNG Irawan (NIM 26996026), Asep Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/7339 ABSTRACT: <br /> <br /> <br /> This study compares the performance of existing adaptive mode of SCATS (Sydney Coordinated Adaptive Traffic System) operation with that of a fixed time coordination mode. The main objectives of the study are: 1) to set up a comparable fixed time coordination with the TRANSYT/9 program; 2) to compare performance of existing adaptive mode with that of the fixed time mode; 3) to observe factors which influence the effectiveness of SCATS operation. <br /> <br /> <br /> The principal parameters for comparison are travel times between intersections, and throughput of individual and all intersections along a corridor with the following characteristics: 1) one way traffic stream; 2)two phase traffic signal operations; 3)low side friction along the corridor . <br /> <br /> <br /> The study site was the Jalan Cipaganti corridor in Bandung comprising four intersections, i.e. with Jalan Pasteur; Jalan Eyckman; Jalan Sampurna and Jalan Lamping. Data were collected in two stages: under adaptive coordination and under fixed time coordination. For each stage, analysis was focussed on two time periods: AM peak hour (07.15-08.15) and PM peak hour (16.00-17.00) <br /> <br /> <br /> The analysis of differences in average travel times, with a confidence level of 95%, show that there are no significant differences for link Pasteur to Eyckman, while for links Eyckman to Sampurna and Sampurna to Lamping travel times under adaptive coordination 74.9% to 243.7% greater than those under fixed time coordination. <br /> <br /> <br /> The analysis of throughput of all intersections shows that in AM peak hour throughput of adaptive coordination is 0.5% to 18% less than that of fixed time coordination, while in PM peak hour, the throughput of adaptive coordination is 1.2% to 36.8% greater than of fixed time coordination. <br /> <br /> <br /> Basically, the two modes of control were found to be not fully comparable because of underlying differences in system objectives. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
ABSTRACT: <br />
<br />
<br />
This study compares the performance of existing adaptive mode of SCATS (Sydney Coordinated Adaptive Traffic System) operation with that of a fixed time coordination mode. The main objectives of the study are: 1) to set up a comparable fixed time coordination with the TRANSYT/9 program; 2) to compare performance of existing adaptive mode with that of the fixed time mode; 3) to observe factors which influence the effectiveness of SCATS operation. <br />
<br />
<br />
The principal parameters for comparison are travel times between intersections, and throughput of individual and all intersections along a corridor with the following characteristics: 1) one way traffic stream; 2)two phase traffic signal operations; 3)low side friction along the corridor . <br />
<br />
<br />
The study site was the Jalan Cipaganti corridor in Bandung comprising four intersections, i.e. with Jalan Pasteur; Jalan Eyckman; Jalan Sampurna and Jalan Lamping. Data were collected in two stages: under adaptive coordination and under fixed time coordination. For each stage, analysis was focussed on two time periods: AM peak hour (07.15-08.15) and PM peak hour (16.00-17.00) <br />
<br />
<br />
The analysis of differences in average travel times, with a confidence level of 95%, show that there are no significant differences for link Pasteur to Eyckman, while for links Eyckman to Sampurna and Sampurna to Lamping travel times under adaptive coordination 74.9% to 243.7% greater than those under fixed time coordination. <br />
<br />
<br />
The analysis of throughput of all intersections shows that in AM peak hour throughput of adaptive coordination is 0.5% to 18% less than that of fixed time coordination, while in PM peak hour, the throughput of adaptive coordination is 1.2% to 36.8% greater than of fixed time coordination. <br />
<br />
<br />
Basically, the two modes of control were found to be not fully comparable because of underlying differences in system objectives. |
format |
Theses |
author |
Irawan (NIM 26996026), Asep |
spellingShingle |
Irawan (NIM 26996026), Asep COMPARISON BETWEEN ADAPTIVE AND FIXED TIME MODES OF SCATS OPERATION ALONG CIPAGANTI CORRIDOR IN BANDUNG |
author_facet |
Irawan (NIM 26996026), Asep |
author_sort |
Irawan (NIM 26996026), Asep |
title |
COMPARISON BETWEEN ADAPTIVE AND FIXED TIME MODES OF SCATS OPERATION ALONG CIPAGANTI CORRIDOR IN BANDUNG |
title_short |
COMPARISON BETWEEN ADAPTIVE AND FIXED TIME MODES OF SCATS OPERATION ALONG CIPAGANTI CORRIDOR IN BANDUNG |
title_full |
COMPARISON BETWEEN ADAPTIVE AND FIXED TIME MODES OF SCATS OPERATION ALONG CIPAGANTI CORRIDOR IN BANDUNG |
title_fullStr |
COMPARISON BETWEEN ADAPTIVE AND FIXED TIME MODES OF SCATS OPERATION ALONG CIPAGANTI CORRIDOR IN BANDUNG |
title_full_unstemmed |
COMPARISON BETWEEN ADAPTIVE AND FIXED TIME MODES OF SCATS OPERATION ALONG CIPAGANTI CORRIDOR IN BANDUNG |
title_sort |
comparison between adaptive and fixed time modes of scats operation along cipaganti corridor in bandung |
url |
https://digilib.itb.ac.id/gdl/view/7339 |
_version_ |
1820664126559485952 |