COST CAPACITY FACTOR MODEL DEVELOPMENT FOR BUILDING CONCEPTUAL COST ESTIMATE
Abstract : <br /> <br /> <br /> Capacity factor method is well known and widely used in construction industry of developed countries as a method in estimating construction cost of petrochemical plants, airport and other engineered facilities at their preliminary planning stage. In...
Saved in:
Main Author: | Fa-Ati Amelia (NIM 250 04 008), Ayar |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/7364 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
COST MODELS FOR APPROXIMATE COST ESTIMATION OF STRUCTURAL SYSTEMS IN COMMERCIAL HIGH RISE BUILDINGS
by: SURINDER SINGH
Published: (2019) -
DEVELOPMENT OF A COST ESTIMATION TOOL FOR PROCUREMENT OF HDB BUILDING COMPONENTS
by: GUALLIN PEH
Published: (2019) -
Capacity investment and efficiency cost estimations in major East Asian ports
by: LOW, Joyce M. W.
Published: (2010) -
IMPACT OF BUILDING INFORMATION MODELLING (BIM) ON PRODUCTIVITY IN COST-ESTIMATING IN THE CONSTRUCTION INDUSTRY
by: NURUL FAIQAH BTE GHAZALI
Published: (2017) -
A quality–time–cost-oriented strategy for product conceptualization
by: Chen, Chun-Hsien, et al.
Published: (2013)