COST CAPACITY FACTOR MODEL DEVELOPMENT FOR BUILDING CONCEPTUAL COST ESTIMATE

Abstract : <br /> <br /> <br /> Capacity factor method is well known and widely used in construction industry of developed countries as a method in estimating construction cost of petrochemical plants, airport and other engineered facilities at their preliminary planning stage. In...

Full description

Saved in:
Bibliographic Details
Main Author: Fa-Ati Amelia (NIM 250 04 008), Ayar
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/7364
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items