DIVERSION CHANNEL PLANNING FOR COAL MINING ACTIVITIES IN TANAH BUMBU DISTRICT, SOUTH KALIMANTAN
Satui Mine is one of the mines that has been operating since the establishment of PT Arutmin Indonesia. Mining activities at Satui Mine continue to be carried out until now, but the original river flow at PIT Rama is indicated to interfere with mining activities. The original river flow also has med...
Saved in:
Main Author: | Aulia Rahman, Farras |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/73795 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PLANNING OF THE MINING RETENTION AREA IN SUNGAI LOBAN DISTRICT, TANAH BUMBU REGENCY, KALIMANTAN SELATAN
by: Risaluddin -
ANALYSIS OF MAXIMUM RAINFALL AND ITS IMPLICATIONS FOR RUN OFF DISCHARGE ON PT BIB MINING SYSTEM ANGSANA SUB-DISTRICT, TANAH BUMBU REGENCY, SOUTH KALIMANTAN
by: Bahar, Febriyanti -
MINE DRAINAGE FACILITY PLANNING ON SOUTH AREA OF PT XYZ COAL MINE SOUTH KALIMANTAN
by: Kartika, Candra -
STUDY OF QUALITY, DEPOSITIONAL ENVIRONMENT COAL, AND EVALUATION OF COALBED METHANE (CMB) POTENTIAL IN MANTEWE SUB-DISTRIC, TANAH BUMBU REGENCY, SOUTH KALIMANTAN
by: Indarwati, Devitayuli -
Feasibility study and mine planning strategy for Asam Coal Mine Project, South Kalimantan
by: , SUKMANA, Nandang, et al.
Published: (2008)