PERENCANAAN INSTALASI PENGOLAHAN AIR LIMBAH ( IPAL) DI KOTA KEDIRI

Kediri City is included in the category of the highest population density in East Java after Surabaya and Malang. The city is a planning area based on priority zones in handling wastewater problems. Therefore, it is necessary to design a WWTP (Wastewater Treatment Plant) in the City. The planning...

Full description

Saved in:
Bibliographic Details
Main Author: Akbar Santosa, Jevien
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/73848
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:Kediri City is included in the category of the highest population density in East Java after Surabaya and Malang. The city is a planning area based on priority zones in handling wastewater problems. Therefore, it is necessary to design a WWTP (Wastewater Treatment Plant) in the City. The planning method for the Kediri City WWTP begins with a literature study related to domestic wastewater management, primary and secondary data collection, data processing, discussion, and conclusions. This planning is carried out with an approach to technical and financial aspects in determining the processing unit for WWTP. In addition to planning the technical aspects, the budget plan (RAB) needed to realize the plan will also be calculated. The distribution system uses a conventional system with a target of 100% service coverage by 2040. The processing units in WWTP are Bar Screen, Grit Chamber, equalization basin, clarifier, Oxidation Ditch, Sludge Drying Bed , and disinfection. The total Budget Plan (RAB) for construction is IDR 14,736,653,000 and operational costs are IDR 18,585,040 / month or IDR 223,020,486 / year.