PERENCANAAN INSTALASI PENGOLAHAN AIR LIMBAH ( IPAL) DI KOTA KEDIRI
Kediri City is included in the category of the highest population density in East Java after Surabaya and Malang. The city is a planning area based on priority zones in handling wastewater problems. Therefore, it is necessary to design a WWTP (Wastewater Treatment Plant) in the City. The planning...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/73848 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Kediri City is included in the category of the highest population density in East Java after
Surabaya and Malang. The city is a planning area based on priority zones in handling
wastewater problems. Therefore, it is necessary to design a WWTP (Wastewater Treatment
Plant) in the City. The planning method for the Kediri City WWTP begins with a literature
study related to domestic wastewater management, primary and secondary data collection, data
processing, discussion, and conclusions. This planning is carried out with an approach to
technical and financial aspects in determining the processing unit for WWTP. In addition to
planning the technical aspects, the budget plan (RAB) needed to realize the plan will also be
calculated. The distribution system uses a conventional system with a target of 100% service
coverage by 2040. The processing units in WWTP are Bar Screen, Grit Chamber, equalization
basin, clarifier, Oxidation Ditch, Sludge Drying Bed , and disinfection. The total Budget Plan
(RAB) for construction is IDR 14,736,653,000 and operational costs are IDR 18,585,040 /
month or IDR 223,020,486 / year.
|
---|