TRAFFIC PERFORMANCE EVALUATION OF STATE-REGULATED STREET TOWARDS THE EFFECTS OF LEVEL RAILWAY CROSSING IN RUSH HOURS (CASE STUDY : LEVEL RAILWAY CROSSING ABDUL RAHMAN SALEH ST. - NURTANIO ST.)

Bandung, a metropolitan city in West Java, is the centre of travel and business destination in the greater and municipality area of Bandung. Abdul Rahman Saleh and Nurtanio Street are two state-regulated streets in Bandung with considerably high volume of passing vehicles due to both being the ma...

Full description

Saved in:
Bibliographic Details
Main Author: Rizki Muharam, Fauzan
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/74066
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:74066
spelling id-itb.:740662023-06-26T10:59:55ZTRAFFIC PERFORMANCE EVALUATION OF STATE-REGULATED STREET TOWARDS THE EFFECTS OF LEVEL RAILWAY CROSSING IN RUSH HOURS (CASE STUDY : LEVEL RAILWAY CROSSING ABDUL RAHMAN SALEH ST. - NURTANIO ST.) Rizki Muharam, Fauzan Teknik sipil Indonesia Final Project Perfomance Analysis, Microsimultion, Level Railway Crossing, Flyover Design, VISSIM INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/74066 Bandung, a metropolitan city in West Java, is the centre of travel and business destination in the greater and municipality area of Bandung. Abdul Rahman Saleh and Nurtanio Street are two state-regulated streets in Bandung with considerably high volume of passing vehicles due to both being the main points of access in and out of downtown in addition to the presence of an active railway crossing. The said crossing has a passing frequency ranging from once every 5 to 30 minutes. Hence a long line of traffic often occurs, particularly in the morning and evening rush hours. This study analysed the traffic performance of state-regulated Abdul Rahman Saleh – Nurtanio Street which intersects with level railway crossing by employing MKJII 1997 method and microsimulation with PTV VISSIM in the current year and for its 20-years projection. Subsequently, an appropriate recommendation was drafted to address the issues in question by comparing the performance before and after corrective actions are taken. The main required data was collected from direct observation employing field surveys, whereas the secondary data was from relevant supporting literature. The formed microsimulation model was based on the data collected from the field observation which had been processed and set according to the calibration parameters in relevant previous studies. The model validation was calculated using GEH statistical method and visual comparison. Analysis results indicated that the site in question will not be able to withstand the capacity in the coming projected years. Hence, corrective actions which encompasses providing additional lanes and a flyover to fulfil the required capacity in the projected years. The corrective recommendation in the form of flyover construction was subsequently composed in the form of basic design which includes geometric planning and estimated cost. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik sipil
spellingShingle Teknik sipil
Rizki Muharam, Fauzan
TRAFFIC PERFORMANCE EVALUATION OF STATE-REGULATED STREET TOWARDS THE EFFECTS OF LEVEL RAILWAY CROSSING IN RUSH HOURS (CASE STUDY : LEVEL RAILWAY CROSSING ABDUL RAHMAN SALEH ST. - NURTANIO ST.)
description Bandung, a metropolitan city in West Java, is the centre of travel and business destination in the greater and municipality area of Bandung. Abdul Rahman Saleh and Nurtanio Street are two state-regulated streets in Bandung with considerably high volume of passing vehicles due to both being the main points of access in and out of downtown in addition to the presence of an active railway crossing. The said crossing has a passing frequency ranging from once every 5 to 30 minutes. Hence a long line of traffic often occurs, particularly in the morning and evening rush hours. This study analysed the traffic performance of state-regulated Abdul Rahman Saleh – Nurtanio Street which intersects with level railway crossing by employing MKJII 1997 method and microsimulation with PTV VISSIM in the current year and for its 20-years projection. Subsequently, an appropriate recommendation was drafted to address the issues in question by comparing the performance before and after corrective actions are taken. The main required data was collected from direct observation employing field surveys, whereas the secondary data was from relevant supporting literature. The formed microsimulation model was based on the data collected from the field observation which had been processed and set according to the calibration parameters in relevant previous studies. The model validation was calculated using GEH statistical method and visual comparison. Analysis results indicated that the site in question will not be able to withstand the capacity in the coming projected years. Hence, corrective actions which encompasses providing additional lanes and a flyover to fulfil the required capacity in the projected years. The corrective recommendation in the form of flyover construction was subsequently composed in the form of basic design which includes geometric planning and estimated cost.
format Final Project
author Rizki Muharam, Fauzan
author_facet Rizki Muharam, Fauzan
author_sort Rizki Muharam, Fauzan
title TRAFFIC PERFORMANCE EVALUATION OF STATE-REGULATED STREET TOWARDS THE EFFECTS OF LEVEL RAILWAY CROSSING IN RUSH HOURS (CASE STUDY : LEVEL RAILWAY CROSSING ABDUL RAHMAN SALEH ST. - NURTANIO ST.)
title_short TRAFFIC PERFORMANCE EVALUATION OF STATE-REGULATED STREET TOWARDS THE EFFECTS OF LEVEL RAILWAY CROSSING IN RUSH HOURS (CASE STUDY : LEVEL RAILWAY CROSSING ABDUL RAHMAN SALEH ST. - NURTANIO ST.)
title_full TRAFFIC PERFORMANCE EVALUATION OF STATE-REGULATED STREET TOWARDS THE EFFECTS OF LEVEL RAILWAY CROSSING IN RUSH HOURS (CASE STUDY : LEVEL RAILWAY CROSSING ABDUL RAHMAN SALEH ST. - NURTANIO ST.)
title_fullStr TRAFFIC PERFORMANCE EVALUATION OF STATE-REGULATED STREET TOWARDS THE EFFECTS OF LEVEL RAILWAY CROSSING IN RUSH HOURS (CASE STUDY : LEVEL RAILWAY CROSSING ABDUL RAHMAN SALEH ST. - NURTANIO ST.)
title_full_unstemmed TRAFFIC PERFORMANCE EVALUATION OF STATE-REGULATED STREET TOWARDS THE EFFECTS OF LEVEL RAILWAY CROSSING IN RUSH HOURS (CASE STUDY : LEVEL RAILWAY CROSSING ABDUL RAHMAN SALEH ST. - NURTANIO ST.)
title_sort traffic performance evaluation of state-regulated street towards the effects of level railway crossing in rush hours (case study : level railway crossing abdul rahman saleh st. - nurtanio st.)
url https://digilib.itb.ac.id/gdl/view/74066
_version_ 1822993532182331392