THE DESIGN OF BANYUMAS REGIONAL PUBLIC HOSPITAL AT BANYUMAS DISTRICT

The final project of redesigning the structure of the Banyumas Regional General Hospital aims to design a hospital building with layout modifications, increasing the number of floors, adding basement floors, and modifying room functions. The location of the building structure is in Banyumas Regency,...

Full description

Saved in:
Bibliographic Details
Main Author: Ramadhina Tiara, Gufira
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/74246
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:74246
spelling id-itb.:742462023-06-27T10:54:35ZTHE DESIGN OF BANYUMAS REGIONAL PUBLIC HOSPITAL AT BANYUMAS DISTRICT Ramadhina Tiara, Gufira Teknik sipil Indonesia Final Project Hospital, Bottom Up, Construction Implementation Method, Project Schedule, Project Cost Estimation, Construction Management. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/74246 The final project of redesigning the structure of the Banyumas Regional General Hospital aims to design a hospital building with layout modifications, increasing the number of floors, adding basement floors, and modifying room functions. The location of the building structure is in Banyumas Regency, Central Java. Construction management design includes work breakdown structure, construction implementation method, construction safety management system, work volume quantification, project schedule preparation, project cost estimation, and project S curve. The construction method used is the bottom up construction method, where the diaphragm wall which functions as a retaining wall uses selected slab reinforcement. The field of construction management design includes geotechnical and structural fields, while the field of architecture and MEP is designed using contextual methods. Detailed project cost calculation using unit price and resource enumeration methods. The budget plan is determined based on direct costs and indirect costs and applicable taxes. Project scheduling is carried out using Microsoft Project so that the implementation duration and S curve can be determined. The final result of the project design is a project value of Rp. 191,782,190.00. The project is planned with a duration of 20 months or 620 calendar days. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik sipil
spellingShingle Teknik sipil
Ramadhina Tiara, Gufira
THE DESIGN OF BANYUMAS REGIONAL PUBLIC HOSPITAL AT BANYUMAS DISTRICT
description The final project of redesigning the structure of the Banyumas Regional General Hospital aims to design a hospital building with layout modifications, increasing the number of floors, adding basement floors, and modifying room functions. The location of the building structure is in Banyumas Regency, Central Java. Construction management design includes work breakdown structure, construction implementation method, construction safety management system, work volume quantification, project schedule preparation, project cost estimation, and project S curve. The construction method used is the bottom up construction method, where the diaphragm wall which functions as a retaining wall uses selected slab reinforcement. The field of construction management design includes geotechnical and structural fields, while the field of architecture and MEP is designed using contextual methods. Detailed project cost calculation using unit price and resource enumeration methods. The budget plan is determined based on direct costs and indirect costs and applicable taxes. Project scheduling is carried out using Microsoft Project so that the implementation duration and S curve can be determined. The final result of the project design is a project value of Rp. 191,782,190.00. The project is planned with a duration of 20 months or 620 calendar days.
format Final Project
author Ramadhina Tiara, Gufira
author_facet Ramadhina Tiara, Gufira
author_sort Ramadhina Tiara, Gufira
title THE DESIGN OF BANYUMAS REGIONAL PUBLIC HOSPITAL AT BANYUMAS DISTRICT
title_short THE DESIGN OF BANYUMAS REGIONAL PUBLIC HOSPITAL AT BANYUMAS DISTRICT
title_full THE DESIGN OF BANYUMAS REGIONAL PUBLIC HOSPITAL AT BANYUMAS DISTRICT
title_fullStr THE DESIGN OF BANYUMAS REGIONAL PUBLIC HOSPITAL AT BANYUMAS DISTRICT
title_full_unstemmed THE DESIGN OF BANYUMAS REGIONAL PUBLIC HOSPITAL AT BANYUMAS DISTRICT
title_sort design of banyumas regional public hospital at banyumas district
url https://digilib.itb.ac.id/gdl/view/74246
_version_ 1822993647413493760