PENGEMBANGAN MODEL ESTIMASI WAKTU PERMESINAN CNC MENGGUNAKAN JARINGAN SARAF TIRUAN
PT X is a make-to-order (MTO) machining product manufacturing company. PT X needs to estimate each order’s lead time in order to estimate the cost at an early stage of the order cycle, due to the unique nature of orders in the MTO industry. These time and cost estimations would then be used to ne...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/74390 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |