DEBOTTLENECKING THE COMPLEXITIES OF STAKEHOLDER MANAGEMENT IN OFFSHORE PLATFORM DECOMMISSIONING: CASE STUDY OF ANGKASA BIRU PROJECT
Indonesia currently has 635 offshore platforms spread around 750,000 km2 working area. Out of the 635 offshore platforms, about 69% are already in aging conditions, more than 30 years old. In 2021, SKK Migas developed a decommissioning roadmap that layout the plan for decommissioning of 100 offshore...
Saved in:
Main Author: | Aresa Mahdi, Desi |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/74439 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
FOUR-LEGGED FIXED OFFSHORE PLATFORM DESIGN AND LIFTING ANALYSIS ON DECOMMISSIONING IN THE MADURA STRAIT
by: Raksa Adyatma, Dhimas -
OFFSHORE PLATFORM DESIGN AND TOPPLING JACKET ANALYSIS USING LIFTING METHOD IN THE DECOMMISSIONING PROCESS
by: Putra Dharmawan, Bagas -
Risk assessment of decommissioning options for offshore facilities
by: Fam, Mei Ling
Published: (2020) -
Onshore Yard Readiness for Upcoming Oil and Gas Offshore Structure Decommissioning Projects in Indonesia
by: Sari Amelia, et al.
Published: (2022) -
IN-SERVICE AND LIFTING ANALYSIS OF OFFSHORE PLATFORM JACKET DURING THE DECOMMISSIONING PHASE WITH VARIATION IN SOIL ADHESION LOADS
by: Adyftha Hawis, Ainun