ANALISIS KELAYAKAN FINANSIAL PEMBANGUNAN AIRCRAFT MAINTENANCE TRAINING ORGANIZATION (AMTO) DI PT DIRGANTARA INDONESIA BERDASARKAN SIMULASI MONTE CARLO
PT Dirgantara Indonesia (PT DI) is a state-owned enterprise that focuses on the aviation industry. PT DI has 4 main business portfolios, such as aircraft, aerostructure, aircraft services, engineering services and weapon system. Just like other companies in the aviation industry, the COVID-19 pan...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/74479 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | PT Dirgantara Indonesia (PT DI) is a state-owned enterprise that focuses on the aviation
industry. PT DI has 4 main business portfolios, such as aircraft, aerostructure, aircraft
services, engineering services and weapon system. Just like other companies in the aviation
industry, the COVID-19 pandemic had a huge impact on the company’s financial condition.
Until now, PT DI’s financial condition is still not good. This is because the company is
having difficulty achieving the sales target for their 4 main business portfolios. However,
the condition of aviation industry is gradually improving. It creates a great opportunity for
PT DI to diversify their business portfolio because there will be an increasing need for
professional technicians in the field of aircraft maintenance and repair.
One of the projects that will be implemented by PT DI regarding aircraft maintenance and
repair is the construction of Aircraft Maintenance Training Organization (AMTO).
However, PT DI is still unsure whether the project will be successful or not because the
limited resources available in the company forces them to invest further in the projects.
Before deciding to accept or reject the project, PT DI needs to conduct a feasibility study to
determine whether the project will be successful or not. However, until now, PT DI only
conducted a feasibility study without considering the risk factors from the project which
makes the result from the feasibility study will not be that accurate. Therefore, it is necessary
to consider the risk factors from each project in the feasibility study. One of the methods that
can be used is a Monte Carlo Simulation.
The result shows that there are differences in NPV between the conventional method and
Monte Carlo Simulation. The amount of NPV from the conventional method is
Rp2.054.079.172. Meanwhile, the amount of NPV from the Monte Carlo Simulation with
95% confidence level is -Rp13.178.393.584 which indicates the project has a greater
probability to result a negative NPV. Therefore, the project is not financially feasible. The
condition for this project to be feasible in a Monte Carlo simulation is that the Indonesian
inflation is around 3.7% during 2023 to 2033 or the number of AMTO A1 registrants in 2024
can reach up to 90 people.
|
---|