DYNAMIC DOUBLE-HOIST SCHEDULING IN SURFACE TREATMENT AREA USING HEURISTIC METHODS
Surface treatment plays a crucial role in enhancing metal quality and function by using chemical processes. In the automation process, optimal scheduling of surface treatment is important to optimize production efficiency and meet customer requirements. Taking case of one of Indonesian aircraft c...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/74775 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:74775 |
---|---|
spelling |
id-itb.:747752023-07-24T08:09:30ZDYNAMIC DOUBLE-HOIST SCHEDULING IN SURFACE TREATMENT AREA USING HEURISTIC METHODS Windia Habiba, Rahadini Indonesia Theses dynamic double hoist scheduling problem, surface treatment, no-wait scheduling, collision-free scheduling, minimizing makespan. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/74775 Surface treatment plays a crucial role in enhancing metal quality and function by using chemical processes. In the automation process, optimal scheduling of surface treatment is important to optimize production efficiency and meet customer requirements. Taking case of one of Indonesian aircraft company, surface treatment with dynamic job characteristics involves double hoist to lifts crane of metals into multiple chemical tanks while considering operational constraints: minimum and maximum processing time, consecutive process sequence, hoist moving time while empty and loaded, no-wait scheduling, and collision-free between the two hoists. Such problem is called as Dynamic Double Hoist Scheduling Problem (DDHSP) and categorized as NP-hard. The objective of the study is to minimize the makespan required to complete all jobs. To address the problem, a combine of optimal computational scheduling using CPLEX followed by heuristic algorithm scheduling is introduced. The proposed algorithm is then evaluated using a set of benchmark and real surface treatment data from the aircraft company and compared with existing methods. Testing of the algorithm is then applied to hypothetic data. The results demonstrate that the combination of optional and heuristic algorithm exhibits smaller makespan in the schedule. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Surface treatment plays a crucial role in enhancing metal quality and function by
using chemical processes. In the automation process, optimal scheduling of surface
treatment is important to optimize production efficiency and meet customer
requirements. Taking case of one of Indonesian aircraft company, surface
treatment with dynamic job characteristics involves double hoist to lifts crane of
metals into multiple chemical tanks while considering operational constraints:
minimum and maximum processing time, consecutive process sequence, hoist
moving time while empty and loaded, no-wait scheduling, and collision-free
between the two hoists. Such problem is called as Dynamic Double Hoist
Scheduling Problem (DDHSP) and categorized as NP-hard. The objective of the
study is to minimize the makespan required to complete all jobs. To address the
problem, a combine of optimal computational scheduling using CPLEX followed
by heuristic algorithm scheduling is introduced. The proposed algorithm is then
evaluated using a set of benchmark and real surface treatment data from the
aircraft company and compared with existing methods. Testing of the algorithm is
then applied to hypothetic data. The results demonstrate that the combination of
optional and heuristic algorithm exhibits smaller makespan in the schedule.
|
format |
Theses |
author |
Windia Habiba, Rahadini |
spellingShingle |
Windia Habiba, Rahadini DYNAMIC DOUBLE-HOIST SCHEDULING IN SURFACE TREATMENT AREA USING HEURISTIC METHODS |
author_facet |
Windia Habiba, Rahadini |
author_sort |
Windia Habiba, Rahadini |
title |
DYNAMIC DOUBLE-HOIST SCHEDULING IN SURFACE TREATMENT AREA USING HEURISTIC METHODS |
title_short |
DYNAMIC DOUBLE-HOIST SCHEDULING IN SURFACE TREATMENT AREA USING HEURISTIC METHODS |
title_full |
DYNAMIC DOUBLE-HOIST SCHEDULING IN SURFACE TREATMENT AREA USING HEURISTIC METHODS |
title_fullStr |
DYNAMIC DOUBLE-HOIST SCHEDULING IN SURFACE TREATMENT AREA USING HEURISTIC METHODS |
title_full_unstemmed |
DYNAMIC DOUBLE-HOIST SCHEDULING IN SURFACE TREATMENT AREA USING HEURISTIC METHODS |
title_sort |
dynamic double-hoist scheduling in surface treatment area using heuristic methods |
url |
https://digilib.itb.ac.id/gdl/view/74775 |
_version_ |
1822279988331675648 |