MODELING TOLL ROAD RAMP-UP PERIOD USING AGENT-BASED SIMULATION WITH REINFORCEMENT LEARNING APPROACH(STUDY CASE: SOREANG-PASIRÂ KOJAÂ TOLLÂ ROAD)
There are several issues that have received less attention but have a significant impact on toll road infrastructure projects, especially those with private sector investment. One of them is the ramp-up period, as the delay of a new toll road infrastructure service in building the demand of its p...
Saved in:
Main Author: | Indra Dharmawan, Weka |
---|---|
Format: | Dissertations |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/74851 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Study of the Impact of Soroja Toll Road Opening on Soreang-Rancabali Road Performance
by: JASMINE GUNARSO (NIM: 15414018), CHINTYA -
RISK ANALYSIS OF TRAFFIC AND REVENUE FORECASTS FOR TOLL ROAD INVESTMENT IN INDONESIA (Study Case : Terbanggi Besar-Bakauheni Path Tegineneng-Babatan Toll Road)
by: Indra Dharmawan (NIM : 25006014) , Weka -
ROAD SAFETY INVESTIGATION IN CIPULARANG TOLL ROAD
by: Nabila, Syahla -
Transport cost at Jakarta intra urban toll road and non toll road
by: , JUNAEDI, Dwi Saponingrum, et al.
Published: (2009) -
THE DESIGN OF PIMPA TOLL ACCESS ROAD ON SURABAYA-GEMPOL TOLL ROAD SECTION
by: Izzaturrahman, Muhammad