PENAMBAHAN KAPASITAS INSTALASI PENGOLAHAN LUMPUR TINJA (IPLT) CIBEET KABUPATEN BANDUNG

Based on “Strategi Sanitasi Kabupaten Bandung”, Cibeet FSTP serves 21% of the population from three sub-districts in the East Bandung area. Population is quite high and will increase every year, it’s estimated that the waste generation in the service area will increase in proportion to the popula...

Full description

Saved in:
Bibliographic Details
Main Author: Harditriyani, Fira
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/74933
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:74933
spelling id-itb.:749332023-07-24T13:50:24ZPENAMBAHAN KAPASITAS INSTALASI PENGOLAHAN LUMPUR TINJA (IPLT) CIBEET KABUPATEN BANDUNG Harditriyani, Fira Indonesia Final Project Bandung, fecal sludge, FSTP, Sludge Drying Bed, DPUTR, Cibeet INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/74933 Based on “Strategi Sanitasi Kabupaten Bandung”, Cibeet FSTP serves 21% of the population from three sub-districts in the East Bandung area. Population is quite high and will increase every year, it’s estimated that the waste generation in the service area will increase in proportion to the population, and from the results of interviews with the “Dinas Pekerjaan Umum dan Penataan Ruang”, there will be additional Cibeet FSTP capacity by expanding the service area into 9 districts. Currently, the generation of existing fecal sludge in FSTP service area is 119,30 m3/day with a Cibeet FSTP capacity of 25 m3/day, the current percentage of FSTP services is 21%. Cibeet FSTP will increase services by up to 63% in 2033, this percentage is divided into two periods, that will be two new treatment systems at Cibeet FSTP, each system will have pre-treatment, sludge stabilization treatment, solids stabilization treatment, stabilization treatment. liquid and advace treatment. Treatment selection is based on considerations of efficiency, sludge generation, reliability, construction costs, operational costs, environmental impact, land requirements, simplicity and sustainability. Based on the analysis, the alternative with manual pre-processing, screw press sludge stabilization treatment, Slude Drying Bed solid stabilization treatment, CMAS liquid stabilization treatment, and disinfection advance treatment has the highest weighting value among the other proposed alternatives. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Based on “Strategi Sanitasi Kabupaten Bandung”, Cibeet FSTP serves 21% of the population from three sub-districts in the East Bandung area. Population is quite high and will increase every year, it’s estimated that the waste generation in the service area will increase in proportion to the population, and from the results of interviews with the “Dinas Pekerjaan Umum dan Penataan Ruang”, there will be additional Cibeet FSTP capacity by expanding the service area into 9 districts. Currently, the generation of existing fecal sludge in FSTP service area is 119,30 m3/day with a Cibeet FSTP capacity of 25 m3/day, the current percentage of FSTP services is 21%. Cibeet FSTP will increase services by up to 63% in 2033, this percentage is divided into two periods, that will be two new treatment systems at Cibeet FSTP, each system will have pre-treatment, sludge stabilization treatment, solids stabilization treatment, stabilization treatment. liquid and advace treatment. Treatment selection is based on considerations of efficiency, sludge generation, reliability, construction costs, operational costs, environmental impact, land requirements, simplicity and sustainability. Based on the analysis, the alternative with manual pre-processing, screw press sludge stabilization treatment, Slude Drying Bed solid stabilization treatment, CMAS liquid stabilization treatment, and disinfection advance treatment has the highest weighting value among the other proposed alternatives.
format Final Project
author Harditriyani, Fira
spellingShingle Harditriyani, Fira
PENAMBAHAN KAPASITAS INSTALASI PENGOLAHAN LUMPUR TINJA (IPLT) CIBEET KABUPATEN BANDUNG
author_facet Harditriyani, Fira
author_sort Harditriyani, Fira
title PENAMBAHAN KAPASITAS INSTALASI PENGOLAHAN LUMPUR TINJA (IPLT) CIBEET KABUPATEN BANDUNG
title_short PENAMBAHAN KAPASITAS INSTALASI PENGOLAHAN LUMPUR TINJA (IPLT) CIBEET KABUPATEN BANDUNG
title_full PENAMBAHAN KAPASITAS INSTALASI PENGOLAHAN LUMPUR TINJA (IPLT) CIBEET KABUPATEN BANDUNG
title_fullStr PENAMBAHAN KAPASITAS INSTALASI PENGOLAHAN LUMPUR TINJA (IPLT) CIBEET KABUPATEN BANDUNG
title_full_unstemmed PENAMBAHAN KAPASITAS INSTALASI PENGOLAHAN LUMPUR TINJA (IPLT) CIBEET KABUPATEN BANDUNG
title_sort penambahan kapasitas instalasi pengolahan lumpur tinja (iplt) cibeet kabupaten bandung
url https://digilib.itb.ac.id/gdl/view/74933
_version_ 1822007533811793920